Railway engineering
Contents |
[edit] Introduction
Railways have been an important part of our transport infrastructure since the 19th century, and their development has enabled the use of trains as an effective and efficient means of travel.
The emergence of railways from around the 1820’s marked the beginning of the end for canals, as trains could carry more goods, more people and travelled much faster. The first steam locomotive to carry passengers began operation in 1825, designed by engineer George Stephenson, on a line between Stockton and Darlington.
Stephenson also developed the Liverpool and Manchester Railway (L&MR), a significant improvement on the first steam locomotive. 'The rocket’, was much more efficient, producing more steam and with horizontal pistons directly driving the wheels. The L&MR opened in 1830.
Railways spread rapidly throughout the UK with the increased demand for coal and steel, and for distribution of things such as newspapers and post. The railways were built by ‘navvies’ who would dig foundations, lay stones and fix the track. Most of the work was done by hand, using a pick axe.
[edit] Types of track
The railway track, also known as the ‘permanent way’, is the long horizontal structure that provides trains with a surface for wheels to roll upon.
[edit] Traditional track
The most common type of track used around the world is ‘flat bottom’ steel rails supported on sleepers made of timber or pre-stressed concrete.
Typically, tracks are laid on a bed of stone track ballast which is supported by prepared earthworks, known as the track formation.
Ballast consists of crushed stone and is used to uniformly distribute loads from the sleepers to the formation. Ballast also helps with stabilisation, drainage and prevents the sleepers from moving. It is typically laid to a depth of between 225-300 mm, filled to the top of the sleepers and beyond the ends of the sleeper by around 250-500 mm.
The track formation consists of a subgrade and blanket – a layer of sand or stone dust in impervious plastic. The blanket restricts the upward movement of wet clay or silt. Additional waterproofing is provided if deemed necessary. The subgrade layer is slightly sloped at the sides to help water drainage. Water is channelled away by ditch or other type of drain.
In order to prevent soil and water from 'spoiling' the ballast, some railways can use asphalt pavement below the ballast, which helps to stabilise it. Where track is to be laid over permafrost, measures such as transverse pipes of cold air can be laid through the subgrade to prevent melting.
[edit] Ballast-less track
An alternative type of track structure that can be used to alleviate the large demand for maintenance that traditional track requires, is one that does not use ballast. This type of track tends to be used for short extensions that require additional strength such as in rail stations, or in tunnels where maintenance is difficult.
At its simplest, this comprises a continuous slab of reinforced concrete upon which rails are supported directly using a resilient pad. An alternate design is the use of pre-cast pre-stressed concrete units which are laid on a base layer.
The drawbacks of this type of track are its high initial cost, and if it is being used to replace existing track it can require lengthy periods of closure. However, due to the reduction in maintenance it can have a lower whole-life cost.
[edit] Continuous longitudinally-supported track
This type of track involves the rail being supported along its length rather than using sleepers. It was experimented with in the 1840s, but proved to be more expensive in terms of maintenance.
A more modern version is the ladder track which uses sleepers which are aligned along the same direction as the rails, with gauge-restraining cross members that resemble the rungs of a ladder. This system can be used with ballast and without.
[edit] Types of rail
Modern rail typically uses hot-rolled steel with a profile similar to that of a rounded I-beam. Because of the high stresses to which they are exposed, rails must be manufactured using very high-quality steel alloy. Rail is graded by weight over a standard length, and the train weight and speed capacity is dependent on the strength of the rails.
In addition to flat-bottom rail, other rail profiles include:
- Bullhead rail.
- Grooved rail.
- Bridge rail (inverted U-shape).
- Barlow rail (inverted V-shape).
Flat-bottom rail is the most commonly used due to its stiffness, greater stability and reduced maintenance requirements. However, bullhead rails are easy to fix and unfix to sleepers, making them useful in applications that necessitate frequent replacement.
As rails are produced in fixed lengths (in the UK, usually around 20 m), they must be joined end-to-end to create a surface that is continuous. The main ways in which this can be done are:
[edit] Jointed track
This consists of lengths of rail that are bolted together using fishplates – perforated steel plates – that are usually 600 mm long and used in pairs on either side of the rail ends.
Small gaps are left between rail ends to act as expansion joints in high temperatures. When trains pass over them, it is this that leads to the ‘clickety-clack’ sound synonymous with railways.
Jointed track requires a large amount of maintenance and does not provide as smooth a ride surface as welded rail, making it less commonly used for high speed trains. It can be prone to cracking around the bolt holes which, unless addressed, can lead to the breaking of the rail head.
For more information, see Movement joint.
[edit] Continuous welded rail
This is a more modern type of rail and consists of rail lengths that are welded together by flash butt welding. This forms one continuous rail without joints, which allows trains to travel at high speeds with less friction. Despite being more expensive to lay welded rails, they have much lower maintenance costs than jointed tracks.
To provide restraint to the rails and prevent movement in relation to the sleepers, clips or anchors are used. A common type of fixing are Pandrol rail clips which fix the rail to the sleeper chair. These are typically manufactured from high quality silicon-manganese steel and, when fixed to concrete sleepers, are fitted with malleable iron shoulders.
The Pandrol ‘Fastclip’ is a fully-captive, pre-assembled, unthreaded rail fastening which means all the components are assembled on concrete sleepers before being delivered to site, eliminating the handling of loose components during track maintenance operations. Hand tools or track-mounted machines are used to tension and de-tension the clips.
[edit] Sleepers
A sleeper is a rectangular support which lies horizontally between both rails to which they are fixed. Sleepers transfer loads from the rails to the ballast and the track formation, as well as maintaining the rail gauge (the correct width between the rails). Sleepers tend to be between 2.5 - 2.75 m long.
Traditionally, sleepers were made of timber treated with preservatives, but these have a shorter lifespan than more modern alternatives such as concrete and steel. Concrete sleepers are pre-stressed and provide extra stability to the track due to their increased weight.
Steel sleepers can be used in applications where hot metal processing and chemical spillage are risks, although they are unsuitable on electrified lines and cannot be used where track circuits exist. They typically take the form of a steel plate formed into an inverted trough with flanged ends.
[edit] Switches and crossings
Switches and crossings vary in terms of complexity and application.
- Turnout: A junction formed by one track converging on another.
- Tandem turnouts: Switches with interlaced left- and right-hand turnouts.
- Crossover: Connection between two adjacent tracks – two turnouts connected by a straight track section.
- Diamond crossing: The plan shape when one track crosses another.
- Frog: A V-shape which allows the flange of a wheel to pass where two rails cross.
- Wing rails: Terminate the ends of the rails diverging from the crossing.
- Check rails: Short rails with bent or flared ends set opposite the frog to provide a guide to the correct rail.
- Switches: Used in connection with turnouts to direct a train to the desired track by changing their position. Connected by a tie-rod to provide simultaneous movement.
[edit] Maintenance
In order to keep railway tracks in good order regular maintenance is essential. Typical jobs involved include:
- Changing sleepers.
- Lubricating and adjusting switches.
- Tightening loose track components.
- Surfacing and lining tracks to retain straightness.
- Spraying ballast with herbicide to prevent growth of weeds.
- Tamping (re-levelling) ballast which is crushed or moved by trains over time.
- Lifting rails and reinserting ballast beneath.
[edit] Related articles on Designing Buildings
- Bascule bridge.
- Bridge construction.
- Civil Engineering during the Industrial Revolution in Britain.
- Construction sidings
- Crossrail 2.
- ECA backs joint rail electrification statement.
- England's Railway Heritage from the Air.
- Frog.
- Funicular.
- High Speed 2 (HS2).
- Infrastructure.
- Learning lessons from HS2.
- Modern train stations.
- Navigable aqueduct.
- Railway stations.
- Road construction.
- Runway construction.
- Scour.
- Swing bridge.
- The longest railway tunnels in the world.
- Transport design and health
- Tunnelling.
- Underpass construction.
- Union Connectivity Review calls for UK-wide strategic transport network.
- Why demolition and infilling are blunt weapons in the management of historic structures.
- Williams-Shapps Plan for Rail.
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.