CLC process map of Building Control Approval for Higher-Risk Building Works
The Construction Leadership Council (CLC) meets with the Building Safety Regulator (BSR), on a weekly basis to address priority areas and maximise communication to the industry on building control approval for higher-risk building (HRB) work.
The work has included establishing a new task and finish group to consider the journey of a new project through the building control process for both the Regulator and industry to support the submission, assessment and timely approval of high quality and compliant building control applications for new HRBs. Ther CLC have noted that:
"As part of this work the CLC intends to provide information and thereby greater clarity to applicants to help achieve successful projects and occupied buildings."
"Initial outputs include the publication of a summary process map of the current building control application process for a new HRB."
"This document brings together for the first time a clear summary of the whole process from planning gateway one to gateway 3 and will evolve as required."
- Understand the whole building control application process – do not approach from just completing one single gateway stage at a time.
- Prepare for gateway 3 from the start – the documents relied upon for gateway 3 evolve through the whole building control application process.
- Provide clear and comprehensive applications – demonstrate compliance with the functional requirements of the Building Regulations – not just what, but the why and how compliance will be achieved.
- Ensure a high quality application – this includes both the plans and documents, and they are not an independent set of documents. Provide sufficient technical detail and cut down on superfluous information such as repeated extracts of the legislation.
- Submit complete applications – check you have followed the application requirements and have submitted the full list of documents for validation.
"Over the coming weeks it is intended that more detailed information and advisory notes on specific elements of the process will be published. This will build on and compliment informative and helpful guidance by other stakeholder groups including Build UK."
This article appears on the CIC news and websites as 'Building Control Approval for Higher-Risk Building Work' dated 24 March, 2025. For more information about the work of the CIC visit https://www.constructionleadershipcouncil.co.uk/.
[edit] Related articles on Designing Buildings
- ACM cladding.
- Building Safety Act.
- Grenfell Tower articles.
- Grenfell Tower Fire.
- Hackitt review.
- High rise building.
- Higher risk buildings.
- Higher risk residential buildings.
- Roof terraces and higher-risk buildings.
- The Higher-Risk Buildings (Description and Supplementary Provisions) Regulations 2023.
- The Higher-Risk Buildings (Key Building Information etc.) (England) Regulations 2023.
- The Higher-Risk Buildings (Management of Safety Risks etc) (England) Regulations 2023.
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.