The first set of national building standards was introduced in 1965. Now known as the Building Regulations, they set out:
- What qualifies as ‘building work’ and so falls under the control of the regulations.
- What types of buildings are exempt (such as temporary buildings).
- The notification procedures that must be followed when starting, carrying out, and completing building work.
- Requirements for specific aspects of building design and construction.
[edit] Building regulations
In England, the Ministry of Housing, Communities and Local Government (MHCLG) is responsible for the Building Regulations 2010 and The Building (Approved Inspectors etc.) Regulations 2010. The regulations apply to most new buildings and many alterations to existing buildings. A series of approved documents provide general guidance about how specific aspects of building design and construction can comply with the Building Regulations.
For more information see: Building regulations.
It is an offence to contravene the building regulations, or to start work that requires a building regulations application without submitting an application, or occupying or using a new building without approval. Failure to comply with the Building Regulations can result in a fine and/or an enforcement notice requiring rectification of the works. There is also a regularisation process for getting approval for works that have been carried out without approval.
[edit] Procedure
The building regulations require that a project's compliance is independently verified. Building control bodies (BCBs) are responsible for checking building work to verify it complies with the regulations. This includes new buildings, alterations, installations and extensions. Historically, this verification could only be carried out by local authorities, however, it can now also be provided by privately appointed approved inspectors.
For more information see: Building control officer.
Generally on larger, new-build projects, a 'full plans' application will be made, meaning that full details of the proposed building works are submitted for approval before the works are carried out.
For more information, see Full plans.
On small projects, or when changes are made to an existing building, approval may be sought by giving a 'building notice'. In this case, a building inspector will approve the works as they are carried out by a process of inspection.
For more information, see Building notice.
It is now also possible for competent persons to self-certify that certain work complies with the building regulations without submitting a building notice or incurring local authority fees.
For more information see: Competent person self-certifications schemes.
[edit] Enforcement
A local authority has a general duty to enforce the building regulations in its area and will seek to do so by informal means wherever possible. If informal enforcement does not achieve compliance with the regulations the local authority has two formal enforcement powers which it may use in appropriate cases:
- If a person carrying out building work contravenes the Building Regulations, the local authority may prosecute them in the Magistrates' Court where an unlimited fine may be imposed (sections 35 and 35A of the Building Act 1984). Prosecution is possible up to two years after the completion of the offending work.
- Alternatively, or in addition, the local authority may serve an enforcement notice on the building owner requiring alteration or removal of work which contravenes the regulations (section 36 of the 1984 Act). If the owner does not comply with the notice the local authority has the power to undertake the work itself and recover the costs of doing so from the owner.
For more information see: What happens if you fail to comply with building regulations.
[edit] Reform
Building control has been subject to scrutiny following the Grenfell Tower fire in 2017.
On 16 May 2018, Building a Safer Future, Independent Review of Building Regulations and Fire Safety: Final Report, was published, setting out more than 50 recommendations for government as to how to deliver a more robust regulatory system. The recommendations of the report included a new regulatory framework for multi-occupancy higher-risk residential buildings (HRRBs) that are 10 storeys or more in height, and a new Joint Competent Authority (JCA) comprising Local Authority Building Standards, fire and rescue authorities and the Health and Safety Executive to oversee better management of safety risks.
For more information, see Hackitt review of the building regulations and fire safety, final report.
In July 2020, the ‘Future of building control working group’ published 11 key recommendations for the future oversight and regulation of the profession and Building Control Bodies including:
- Steps to simplify and unify building control legislation, process and procedures.
- An independent designated body to oversee professional registration and organisational audit.
- A new competence framework to cover all persons working in building control including those working on higher risk buildings in scope of the new regulator.
- A unified pan-industry code of conduct for all Building Control Bodies and professionals.
- A unified pan-industry career structure to set expectations of competence across the building control sector.
[edit] Related articles on Designing Buildings Wiki
- Approved documents.
- Approved inspector.
- Building control body.
- Building control performance standards.
- Building notice.
- Building Regulations Advisory Committee (BRAC).
- Building regulations completion certificate.
- Building regulations inspection.
- Building warrant (Scotland).
- Competent person schemes.
- Competent person.
- Do the building regulations apply to existing buildings?
- Failure to comply with the building regulations.
- Full plans.
- How long it takes to get building regulations approval and how long it lasts.
- Independent review of the building regulations and fire safety.
- Local Authority Building Control.
- Scottish building standards.
- The Building Act.
- The difference between planning permission building regulations approval.
- Welsh building regulations.
- What approvals are needed before construction begins.
Featured articles and news
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.