Sections in building design
In terms of design, the term ‘section’ typically refers to a view of a structure as though it has been sliced in half or cut along another imaginary plane, which is generally, but not always a vertical plane. This is represented as a ‘section drawing’ or ‘sectional drawing’. This can be useful when designing or representing structures such as buildings as it gives a view that passes through spaces such as rooms and also through the building fabric, and this can reveal relationships between the parts of the building that might not be apparent on plans or elevations.
For more information, see Section drawing.
In a wider sense, 'section' can also refer to a specific part of a document, regulation, standard or agreement. For example, Section 50 agreement, Section 73 of the Town and Country Planning Act 1990, a planning obligation (section 106), and so on.
It can also be used in relation to a section engineer, the role of which is to lead a team of site engineers, usually on civil engineering and infrastructure projects. They are responsible for all engineering matters related to a project or specific part of a project, such as a road or tunnel. For more information, see Section engineer.
It may also refer to work sections, that is, parts of construction works. For example, NRM2 lists work sections for work section breakdown structures, used to prepare some types of bills of quantities. For more information, see Work section bill of quantities.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
Comments