Canals are human-made channels used for water conveyance (supply), or to service water transport vehicles. The oldest known canals were used for irrigation purposes, built in approximately 4000 BC in the region of the Middle East that is now modern day Iraq and Iran.
[edit] How canals are constructed
Canals can be constructed in different ways:
- A new canal can be created by excavating the body of the canal and providing water from an external source, such as streams or reservoirs.
- Dredging a channel in the bottom of an existing lake which is then drained.
- A stream can be canalised to make its navigable path more predictable and easier to manoeuvre. This involves dredging, damming and modifying its path.
[edit] What canals do
Canals use engineered structures such as:
- Weirs and dams: To raise river water levels to usable depths.
- Looping descents: To create a longer and gentler channel around a stretch of rapids or falls.
- Locks: So that ships and barges can ascend and descend.
[edit] Canal locks in action
A lock consists of a lock chamber which may be made from brick, stone or metal. This chamber holds the water. There are typically gates at each end of the lock chamber, and these gates control the flow of water.
When a vessel is at a lower point, a gate is allowed to open, which permits water to enter the lock and fill it with water. Once the water level is at the higher height, the vessel can continue on its journey.
The opposite action is used when the vessel is at a higher position and needs to proceed to a lower level. The vessel enters the lock with a high water level and then a gate opens - allowing the water to be released. When the water is at the adjusted lower level, the vessel is able to proceed.
In most instances, the main lock gates can only be opened when the water on both sides is at the same level. This means that the top lock only opens if the lock is full, and the bottom lock only opens when it is nearly empty.
[edit] Legging it
Legging was an early method of navigating vessels through canal tunnels. This practice was sometimes used during the 18th and early 19th centuries.
When horses, donkeys or other towing animals were not able to follow a towpath through a tunnel, people would have to move the boat with their feet by “walking” along the wall or roof of the canal tunnel. Professional wall walkers could be hired to take the vessels on longer tunnels, but it was more common for the operator of the boat to handle the task with assistance from the crew.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.