Manufacturers in the construction industry
A manufacturer is an organisation or business that produces goods to sell them to a customer. Manufacturers transform raw materials, components, assemblies, and so on, into finished products, often involving processes organised into a production line.
Manufactured products are commonly made on a large scale before being distributed to customers, wholesalers, distributors, retailers and so on.
Manufacturing operations tend to utilise one of the following types of production:
- Make-to-stock (MTS): Goods are produced by predicting the market and producing regardless of orders being received. There is the risk that producing too much will result in needing to sell any surplus at a loss, whereas producing too little will result in not selling enough to maximise profit or even cover operating costs.
- Make-to-order (MTO): Goods are produced when orders are received, making it easier to control inventory. However, this can result in longer waiting times for clients, and a steady stream of orders is required otherwise production will stop.
- Make-to-assemble (MTA): Component parts are produced in anticipation of orders for assembly. This means the manufacturer is ready to fulfil orders, but it can result in a backlog of parts that are waiting to be used if demand is slower than anticipated.
Testing and certification can be used to verify quality.
Manufacturers must adhere to certain standards and regulations when producing their goods. For example, the Eco-Design for Energy-Related Products Regulations 2010 requires manufacturers to achieve minimum standards for the amount of energy regulated products consume. A declaration of conformity must be drawn up by the manufacturer or importer and the CE mark applied.
In the construction industry, manufacturers are often referred to as suppliers. For more information see: Suppliers.
NB The Code for Construction Product Information, Version 1.0, published by CCPI in September 2021 defines a manufacturer as: “any natural or legal person who manufactures a Construction Product, or has a Construction Product designed or manufactured and places it on the market under their own name or trademark”.
Designing Buildings Wiki has a range of articles relating to manufacturing, including:
- 3D printing in construction.
- Advanced manufacturing.
- British Standards Institution BSI.
- Buildability in construction.
- Building information modelling and its effect on computer aided manufacture in the UK construction industry.
- Circular economy.
- Computer aided manufacturing CAM.
- Demand for Off-Site Construction Continues to Increase in the UK’s Manufacturing Sector.
- How Computer Aided Manufacturing is Changing the World.
- Intelligent building management systems IBMS.
- Intermediate product.
- Kitemark.
- Lean construction.
- Life cycle assessment.
- Manufacturing better buildings.
- Mean lean green.
- Modern methods of construction.
- Offsite manufacturing.
- Offsite manufacturing and standardised design.
- Prefabrication.
- Product transparency declaration.
- Purchase orders.
- Quality control for construction works.
- Virtual reality and manufacturing.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Preparing for the future: how specifiers can lead the way
Effective specificationand the Future Homes Standard.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Update on the future of Grenfell Tower
Deputy Prime Minister decides for it be carefully taken down to the ground.
Ending decades of frustration, misinformation and distrust.