Logistics management in construction
Logistics management is the process of planning, implementing and controlling supply chain resources, generally from the point of origin, such as raw material accumulation, to the point of destination, i.e. delivering goods to the correct location on the construction site.
Effective logistics management is important can enhance efficiency and productivity, having a positive overall impact on cost and time. For example, good logistics management ensures the workforce are able to carry out required activities without delays caused by materials being delivered to site.
Logistics management involves the integrating of many activities:
- Resource assessment.
- Lead time assessment.
- Supply and demand planning.
- Sourcing and procurement.
- Production planning and scheduling.
- Packaging and assembly.
- Inventory management and order fulfilment.
- Inbound and outbound transport management.
- Warehousing.
- Materials handling.
- On site vehicle and plant management.
- Customer services.
- Waste management.
Having a timeline of project stages planned in advance, with a full inventory of materials and tools required, is a key part of logistics management. Due to the complexity of the process, and the interaction of many supply streams, dedicated simulation software can be used to model, analyse, visualise and optimise logistics.
In addition to keeping the construction programme on-schedule, other advantages of good logistics management include:
- Cost savings and waste reduction as productivity is enhanced.
- Logistical planning on site enables materials to be stored correctly which improves efficiency and reduces the potential for damage
- Sites can be kept safe, clean and easy to move around.
- Deliveries can be received and handled promptly.
Construction consolidation centres (CCC) can be used as a part of logistics management. These are locations near to but not necessarily on site, to which deliveries are made and stored. They are then brought to the site on a ‘just in time’ basis as and when required. This has the advantage of keeping the site clear of obstacles, cutting down on required storage space, and ensures that the logistics manager is aware that the materials are available close-at-hand.
For more information, see Construction consolidation centre (CCC).
Typically, a construction logistics manager will be responsible for the logistics supply chain. The main responsibilities of a logistics manager will include the coordination of the workforce, goods and equipment at the construction site. They should engage with the project planner, commercial management and construction manager to ensure that all activities are properly coordinated across the project.
For more information, see Construction logistics manager.
See also: Site logistics.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Call-off contract.
- Construction buyer.
- Construction consolidation centre (CCC).
- Construction inventory management.
- Construction logistics manager.
- Construction logistics plan.
- Construction Logistics and Community Safety.
- Fleet operator.
- Fleet Operator Recognition Scheme.
- Forward-logistics.
- How to manage construction plant.
- Inventory.
- Lean construction.
- Lean construction - a quality perspective.
- Logistics data.
- Materials on site.
- Off site materials.
- Programme for building design and construction.
- Resource management.
- Reverse-logistics.
- Scheduling construction activities.
- Site logistics.
- Site storage.
- Supply chain management.
- Understanding agile in project management.
[edit] External resources
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Preparing for the future: how specifiers can lead the way
Effective specificationand the Future Homes Standard.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February