Logistics management in construction
Logistics management is the process of planning, implementing and controlling supply chain resources, generally from the point of origin, such as raw material accumulation, to the point of destination, i.e. delivering goods to the correct location on the construction site.
Effective logistics management is important can enhance efficiency and productivity, having a positive overall impact on cost and time. For example, good logistics management ensures the workforce are able to carry out required activities without delays caused by materials being delivered to site.
Logistics management involves the integrating of many activities:
- Resource assessment.
- Lead time assessment.
- Supply and demand planning.
- Sourcing and procurement.
- Production planning and scheduling.
- Packaging and assembly.
- Inventory management and order fulfilment.
- Inbound and outbound transport management.
- Warehousing.
- Materials handling.
- On site vehicle and plant management.
- Customer services.
- Waste management.
Having a timeline of project stages planned in advance, with a full inventory of materials and tools required, is a key part of logistics management. Due to the complexity of the process, and the interaction of many supply streams, dedicated simulation software can be used to model, analyse, visualise and optimise logistics.
In addition to keeping the construction programme on-schedule, other advantages of good logistics management include:
- Cost savings and waste reduction as productivity is enhanced.
- Logistical planning on site enables materials to be stored correctly which improves efficiency and reduces the potential for damage
- Sites can be kept safe, clean and easy to move around.
- Deliveries can be received and handled promptly.
Construction consolidation centres (CCC) can be used as a part of logistics management. These are locations near to but not necessarily on site, to which deliveries are made and stored. They are then brought to the site on a ‘just in time’ basis as and when required. This has the advantage of keeping the site clear of obstacles, cutting down on required storage space, and ensures that the logistics manager is aware that the materials are available close-at-hand.
For more information, see Construction consolidation centre (CCC).
Typically, a construction logistics manager will be responsible for the logistics supply chain. The main responsibilities of a logistics manager will include the coordination of the workforce, goods and equipment at the construction site. They should engage with the project planner, commercial management and construction manager to ensure that all activities are properly coordinated across the project.
For more information, see Construction logistics manager.
See also: Site logistics.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Call-off contract.
- Construction buyer.
- Construction consolidation centre (CCC).
- Construction inventory management.
- Construction logistics manager.
- Construction logistics plan.
- Construction Logistics and Community Safety.
- Fleet operator.
- Fleet Operator Recognition Scheme.
- Forward-logistics.
- How to manage construction plant.
- Inventory.
- Lean construction.
- Lean construction - a quality perspective.
- Logistics data.
- Materials on site.
- Off site materials.
- Programme for building design and construction.
- Resource management.
- Reverse-logistics.
- Scheduling construction activities.
- Site logistics.
- Site storage.
- Supply chain management.
- Understanding agile in project management.
[edit] External resources
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.