Construction consolidation centre (CCC)
Contents |
[edit] Introduction
A construction consolidation centre (CCC) is a distribution facility that can be used in the process of managing project logistics, channelling material deliveries to a large, single construction site or a number of different sites. It facilitates the efficient flow of materials through the supply chain, reducing waste and other issues such as congestion.
Construction materials are delivered from suppliers to the CCC where they are stored until call-off from the site, at which point the CCC operator makes up and delivers a consolidated load. This is done on a ‘just in time’ basis, for enhanced efficiency.
Usually, the main contractor takes the decision to use a CCC and so carries the cost. However, subcontractors, suppliers and hauliers all see the benefit and so there can be an effort to spread the costs.
While distribution centres have been commonly used in other sectors in the UK, currently there are only a few examples of CCCs. The Heathrow Consolidation Centre (HCC) was established in 2001 for the ongoing work at Heathrow airport. In 2005, the London Construction Consolidation Centre (LCCC) was set up as a pilot study. Subsequently, Wilson James took over the LCCC and relocated it to Silvertown, near City Airport. The house builder Taylor Wimpey has set up Taylor Wimpey Logistics which consolidates materials in a Newmarket facility that then provides for its sites across England and Wales.
[edit] Specifications
[edit] Project size
The use of a CCC is not necessarily dependent on the size of a project, but rather whether there is an ongoing business volume to make it worthwhile. Shared user CCCs can be an option as opposed to single users, which allows the operating costs to be spread between users.
[edit] Location
As a general rule, CCCs are located close to a motorway or major road network. This is so that the impact on local roads is kept to a minimum and to minimise the turnaround times of hauliers.
Sometimes a CCC is situated where several different sites can be reached in 30-45 minutes, but it can be more sensible, if there are a reasonable number of sites, to have two smaller CCCs, each of which are closer to the respective sites, than one large CCC.
[edit] Advantages
There are several advantages associated with using CCCs. Studies looking into their general impact have found:
- Up to 70% reduction in freight traffic to site.
- A 6% productivity gain based on increased workforce productivity of 30 minutes per day.
- A 7-15% reduction in waste.
- More efficient utilisation of delivery vehicles.
- Reduced carbon emissions and traffic congestion.
- Noise and pollution reductions.
- Reverse logistics means that journeys from the site can be used for waste removal, return of unused materials, and so on.
- Cost savings associated with fewer and more efficient vehicle journeys.
- Improved programme certainty.
- Better storage facilities than are often available on site.
- Excess packaging can be removed at the CCC rather than creating clutter on site.
- Materials delivery can be sequenced.
- Manufacturer errors or damage can be detected at the CCC rather than when delivered to site.
[edit] Related articles on Designing Buildings Wiki
- Circular economy.
- Construction logistics manager.
- Design for Manufacture and Assembly (DfMA).
- Forklift.
- Lean construction.
- Logistics management.
- Materials on site.
- Mean lean green.
- Off site materials.
- Site storage.
- Site Waste Management Plan.
- Waste and Resources Action Plan WRAP.
- Warehouse.
[edit] External resources
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.