Attestation of conformity AoC
The Construction Products Regulation (CPR) was introduced in 2011 to harmonise performance information on construction products across the European Economic Area (EEA). It is made most visible by the mandatory CE marking of regulated products.
Some parts of the Construction Products Regulation applied from 24 April 2011, but it came into force in full on 1 July 2013. From this time, construction products placed on the market in the EEA that are covered by a harmonised European product standard or a European Technical Assessment need to be CE marked and accompanied by a Declaration of Performance (DoP). This is intended to ensure that reliable technical information is provided about the performance of construction products in a common technical language and tested using consistent assessment methods.
Demonstrating compliance with the regulations requires ‘attestation of conformity’ (AoC). There are five levels of attestation of conformity depending on the nature of the product. The lowest levels (1 or 1+) have the most demanding requirements and might be necessary for products with safety-critical aspects. The highest level (4) is the least demanding and might for example apply to decorative products.
Non-safety critical attestation might be carried out by the manufacturer themselves, whilst safety critical testing might have to be undertaken by a notified body.
[edit] Related articles on Designing Buildings Wiki
- Attestation.
- British Standards.
- CE marking.
- Construction Products Regulations.
- European Technical Approval.
- Kitemark.
- Standards.
[edit] External references
- BSI, Construction Products Regulation (CPR).
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.