Walt Disney Concert Hall
Gehry's Walt Disney Concert Hall, Los Angeles
Contents |
[edit] Introduction
Walt Disney Concert Hall was built in Los Angeles, California as the base for the Los Angeles Philharmonic orchestra and the Los Angeles Master Chorale. The building was originally proposed in 1987 after Walt Disney’s widow Lillian bestowed a $50 million gift to the city of Los Angeles. However, it took more than 15 years (and an additional $224 million) to complete the project.
Planning stalled under bureaucratic red tape and a lack of funding in 1994, but the project got back on track in 1997. At that point, Frank Gehry’s architectural firm was given permission to proceed with designs that were originally presented and approved in 1991. The venue opened in 2003.
[edit] The LA connection
Although Canadian by birth, Frank Gehry had a special affinity for the Disney Concert Hall and Los Angeles - it was the first large project by his firm in the city Gehry had called home since 1947. In response to the honour, Gehry and his firm designed one of the most acoustically sophisticated concert halls in the world, providing both visual and aural intimacy for an unparalleled musical experience. For more information on the architect, see Frank Gehry.
As a public gathering place in a busy city, the facility - with its numerous entrances, parks, pedestrian areas and restaurants - presented security challenges. As the project was conceived before the U.S. terrorist attacks of 11 September 2001, security measures had to be revisited and plans revised. The main entrance retains its sense of drama and openness while incorporating additional security through staffing and systems.
[edit] Acoustic excellence
The marriage of aesthetics and acoustics was another challenge for the designers. The centrepiece of the hall, the main auditorium, is the result of a collaboration between Frank Gehry Partners and Nagata Acoustics, with additional consultation provided by the orchestra’s former music director, Esa-Pekka Salonen (who went on to become conductor laureate for the orchestra). Execution of the acoustic design was primarily handled by Yasuhisa Toyota of Nagata Acoustics.
Interior (including the 'French fries' pipe organ, centre) of the Walt Disney Concert Hall.
Panelled in Douglas fir, the curved interior design of the hall retains the acoustic characteristics and intimacy of a traditional ‘shoebox’ theatre. Even the 2,265 seats in the hall play an important part in its design.
Members of the audience surround the orchestra platform and a pipe organ (dubbed ‘the French fries’ by Gehry, who designed its essential form) occupies a central position between the seating sections at the rear of the stage. The execution of the design for the pipe organ was undertaken by Manuel Rosales, and it was constructed by Caspar Glatter-Gotz in Owingen, Germany.
[edit] Dynamic look and feel
The main entrance to the building features an expanse of glass, a grand stairway, an oval courtyard and several atria spaces. The facility’s grounds also feature a children’s amphitheatre that seats up to 300, and a second performing space that accommodates an audience of 120. A large portion of the site is dedicated to an urban public park with an expansive garden and ornamental landscaping.
Inside the hall there are very few right angles. The building’s orientation, combined with the curvature of the exterior walls, presents highly sculptural compositions that wrap the entire building and present complex profiles to the surrounding neighbourhood.
This design mandated innovative construction techniques. At the time, no architectural software existed to reproduce Gehry’s fluid shapes and concepts, so instead he adapted a French technology called CATIA that had been previously used for the aerospace and automotive industries.
[edit] The not-so-perfect finish
Disney Concert Hall was originally designed with a stone finish - which was Gehry’s preference for its 'warmth' - but planners were so impressed by Gehry’s Guggenheim Museum in Bilbao (which opened in 1997) that they insisted on stainless steel panels for the facade. For more on the Guggenheim Museum Bilbao, see Guggenheim Museum, Bilbao.
Gehry's Guggenheim Museum, Bilbao
After installation, this finish created problems when reflections from the surface were linked to an increase in traffic accidents. In 2005, after numerous complaints, the stainless steel was sanded and dulled to reduce the glare.
[edit] An iconic addition to the cityscape
With its sweeping silver sails, the dramatically curved entrance of the Disney Concert Hall was meant to embody energy, innovation and the creative spirit of the city. The hall is viewed as the crown jewel in the redevelopment of downtown Los Angeles.
As part of the city’s Grand Avenue Pedestrian Improvement Project, Disney Concert Hall occupies a 3.6 acre site and takes up an entire city block in the historic Bunker Hill neighbourhood of Los Angeles. The Concert Hall is part of a cultural and entertainment complex that includes several other performing arts venues, a school, a cathedral, a sports facility, a public library and an art museum.
[edit] Project data
- Location: Los Angeles, California, USA
- Construction started: 1999
- Completed: 2003
- Floor space: 27,220 m2
- Architect: Gehry Partners, LLP
- General contractor: M.A. Mortenson
- Construction cost: $274 million
- Owner: County of Los Angeles
[edit] Related articles on Designing Buildings Wiki
- Acoustic consultant.
- American architecture and construction.
- Binoculars Building.
- Building acoustics.
- Dancing House, Prague.
- Deconstructivism.
- Fish Building, India.
- Frank Gehry.
- Guggenheim Museum, Bilbao.
- ING House.
- Interview with Kevin Borg, founder of KJB Building Consultants.
- Parterre.
- Piano Building.
- Postmodern architecture.
- Ray and Maria Stata Center.
- Steel.
- Unusual building design of the week.
Featured articles and news
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.