[edit] Introduction
The Guggenheim Museum (Museo Guggenheim) in the Spanish port city of Bilbao, is one of the most iconic examples of modern architecture, and has been described as 'the greatest building of our time'.
Opening in September 1997, the sculpture-like titanium skinned structure that shimmers as its different angles and curves catch sunlight has been credited with changing the way architects approach the design of museums. Sited near to a road and bridge it acts as a landmark for those travelling.
As one of several owned by the Solomon R. Guggenheim Foundation, this modern and contemporary art museum features permanent and visiting exhibits by Spanish and international artists and has become one of the region's most popular tourist attractions, credited with revitalising the city of Bilbao.
The Canadian-American architect Frank Gehry was selected by the Guggenheim Foundation and challenged to design a building that would be both innovative and daring. He wanted to integrate the design within Bilbao's urban pattern, with spectacular use of flowing canopies, cliffs, promontories, maritime shapes, towers and flying fins that from above appear almost floral.
[edit] Design and construction
The Basque government approached the Guggenheim Foundation in 1991 with the idea of setting a new Guggenheim museum in Bilbao's then-decrepit port area. This was to be the focal point of their redevelopment plans to rejuvenate and modernise the old industrial town. The government agreed to cover the construction costs and subsidise the museum's annual budget.
Taking the port location alongside the Nervion River as inspiration, Gehry's design was intended to be modest when viewed from street level but spectacular when seen across the river. His childhood fascination with fish was said to have inspired the gleaming titanium tiles that appear like giant herring scales. The titanium, limestone and glass curves of the exterior sweep seemingly at random, with a rippling effect made possible by fixing clips that create a shallow central dent in each of the tiles. The 33,000 tiles are very thin and produce a rough and organic effect which changes colour depending on the varying weather and light conditions.
The mathematical intricacy of the twisting curves required the use of innovative 3D design software CATIA, developed predominantly for the aerospace industry. This allowed for Gehry's complex designs to be rendered as digital models that could then be honed and refined. Gerry used the CATIA engine and created his own software called Gehry Technologies.
Large glass curtain walls connect the interior and exterior and flood the central atrium with light. At the top of the 45-metre high atrium is a large skylight in the shape of a metal flower. The building's three levels are connected to the atrium by curved walkways, staircases, and titanium and glass elevators.
The building is 24,000 m2, of which 11,000 m2 is dedicated to exhibition space. Ten of the museum's nineteen galleries can be identified by the limestone finish on the exterior, while the other nine can be identified by swirling titanium-clad forms. “I was looking for a way to express feeling in three-dimensional objects,” he told Sidney Pollack during an interview. Everything he designed was directed toward the goal of encouraging the same kind of emotional engagement with architecture that people expect to have with art (Goldberger, P. 2015)
It was constructed on time and on budget by Spanish contractors Ferrovial at a total cost of $89 million. At the time titanium was cheaper than stainless steel, Gehry's second choice should titanium prove too expensive. It is one of very few buildings clad in titanium worldwide.
[edit] Post-completion
The museum was opened in October 1997 by Juan Carlos I of Spain, and was almost universally lauded as an architectural triumph. It has since been described as a masterpiece of the 20th century and a spectacular example of the Deconstructivist style.
The museum has also inspired the term 'the Bilbao effect' to describe the socio-economic impact landmark architecture can have on the overall success of a city. During the first three years of opening, the museum welcomed almost 4 million visitors which generated around €500 million in economic activity (hotel, restaurants, shopping, local jobs to support increased tourists and payment of taxes among other items). The museum attracts about 1 million visitors every year.
The Guggenheim provoked a spate of 'statement' architecture designed buildings by 'starchitect' figures that largely failed to emulate its success. This museum was the third building in Bilbao and is part of the cities regeneration of the former port area and sits close to the university. An architecture series video is worth watching to fully understand the aesthetic experience of this building.
[edit] Project data
- Address: Abandoibarra Etorb., Bilbao, Bizkaia, Spain
- Construction started: October 1993
- Completed: October 1997
- Floor space: 24,000 m2
- Floors: 3
- Architect: Frank Gehry
- Main contractor: Ferrovial
- Construction cost: $89 million
- Owner: Solomon R. Guggenheim Foundation
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- 7 Engineering Wonders of the world.
- British Museum.
- Building of the week series.
- Casa Mila.
- Centre Pompidou.
- Dali Theatre and Museum.
- Deconstructivism.
- Frank Gehry.
- Gentle Genius.
- Kunsthaus Graz.
- Lloyds of London.
- MAAT, Lisbon.
- Millennium Dome.
- Niteroi Contemporary Art Museum.
- Ray and Maria Stata Center.
- Sage Gateshead.
- Switch House, Tate Modern.
- Solomon R. Guggenheim Museum.
- The Gherkin.
- The history of fabric structures.
- Titanic Belfast.
- Walt Disney Concert Hall.
[edit] External references
- Guggenheim - Official site
- ArchDaily - The Guggenheim Museum
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February