A garage is a common type of single-storey building, typically constructed to adjoin an existing building, and used for keeping vehicles, as storage space, and so on. The method of connection requires careful consideration, in particular, openings between the extension and the existing building (if there are any), junctions with the existing roof structure, the positions of existing flues, drains, and so on.
A garage can also be constructed as an independent structure which is not adjoined to the main building, or it can be incorporated within the main building.
Building Regulations approval is required for building a garage but planning permission may not be in all instances – the local authority should be able to advise as to whether it planning permission is needed or not. As an outbuilding, a garage may be considered a permitted development which will not require planning permission as long as:
- It is not forward of the wall forming the principal elevation.
- It is single-storey with a maximum eaves height of 2.5 m, and maximum overall height of 4 m with a dual-pitched roof, or 3 m for any other roof.
- It has a maximum height of 2.5 m within 2 m of a boundary.
The first stage of building a garage is to develop a design which lays out the dimensions and features in detail. An important consideration is where side access from the main building will be and whether a section of the existing wall will be able to be taken out to allow for the installation of a door. It is also important to establish how vehicles will access the garage, turn and so on.
It will be important, if the garage is to be used for storing a vehicle, that the correct size is ascertained, bearing in mind door opening radii. Typical sizes are 3.5 x 6 m for a single garage, and 6.5 x 6.5 m for a double garage (for two vehicles). The height of the door opening is also an important consideration.
Before beginning construction, the ground must be levelled and the firmness assessed. Hardcore can be used to level and firm up soft ground. Services will also need to be provided for power, drainage and sometimes a water supply.
Some of the topsoil will generally be removed, typically around 6 inches, so that the concrete slab will be level with the surrounding ground. A layer of firm tamped sand should be provided as support for the concrete which will be poured on top. It can be advisable to install a damp-proof membrane if the ground is prone to damp. This should be added to the whole base and also between the concrete and the adjacent wall to avoid damp transfer.
Structural rebar can be installed to reinforce the concrete slab if required, and then the concrete poured and left to cure.
When the foundation has set the walls can be constructed and then the roof built, typically using joists and rafters. Garage roofs are most commonly pitched or flat.
The garage then needs to be wired with electricity and lighting provision, insulated, installed with drywall (if required), and then painted (if required).
The final step is to install the garage door, which can be made of timber, steel or fibreglass. Many are fitted with a remote-control system which automatically raises and closes the door.
[edit] Related articles on Designing Buildings Wiki
- Basements in buildings.
- Building an extension.
- Carport.
- Conservatory.
- External doors.
- Hiring an architect as a domestic client.
- How to build a porch.
- How to find a builder.
- How to lay block paving.
- Incorporating a concrete garage into the landscape
- Loft conversion.
- Outbuildings.
- Permitted development.
- Planning permission.
- Renovation.
- Self-build homes.
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.