Minor works
The phrase ‘minor works’ refers to small, relatively straight-forward construction projects, typically less than £500,000 in value.
In particular the phrase is used in relation to the Joint Contracts Tribunal (JCT) Minor Works Building Contract. This contract follows the traditional procurement route, where first the design is completed, and then a contractor is appointed to construct the works. JCT do not set a limit for the minor works building contract in terms of value, but typically it will be used on projects of less than £250,000.
More important than value in determining whether this is an appropriate form of contract is the nature of the project.
It can be used for projects where:
- The project is fairly simple.
- The project should last no more than 12 months.
- The client is responsible for procuring the design, including drawings, a specification, or work schedules.
- Or the contractor is responsible for designing specific parts of the works (Minor Works Building Contract with contractor’s design).
It is not suitable where:
- The project is more complex.
- The project design includes bills of quantities.
- The project has detailed control procedures.
- The project has multiple phases or sections.
- There are provisions to govern work carried out by named specialists.
The JCT Minor Works Building Contract is more straight forward to administer than many other forms of contract, however, the parties will still need to be very clear of their obligations and liabilities and the risks that they are accepting. Generally the client’s architect or contract administrator will administer the contract.
Other standard forms of minor works contract are available. The New Engineering Contract (NEC) states that its contracts can be used for minor works, and the Federation of Master Builders publishes a freely available suite of minor works contracts.
The Institution of Civil Engineers (ICE) and the Government Conditions of contract (GC Works) contracts have now been withdrawn in favour of NEC contracts.
NB Safety at Street Works and Road Works, A Code of Practice, published by Department for Transport in October 2013, defines minor works as: ‘works with a planned duration of three days of less, excluding immediate or major works.’
[edit] Related articles on Designing Buildings
- Causes of construction disputes.
- Construction contracts.
- Contract claims.
- JCT.
- JCT Design and Build Contract.
- JCT Sub-subcontract.
- Modifying clauses in standard forms of construction contract.
- NEC contract.
- Procurement route.
- Repair and maintenance contract.
- RIBA Concise Building Contract.
- RIBA Domestic Building Contract.
- Standard Building Contract.
- Traditional contract.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February