Schedule of work for construction
Contents |
[edit] Introduction
Schedules of work (or schedule of works) are 'without quantities' instructional lists often produced on smaller projects or for alteration work. They are an alternative to bills of quantities, allowing the pricing of items, such as builders' work and fixing schedules (such as sanitary fittings, doors, windows, ironmongery, light fittings, louvres, roller shutters, diffusers, grilles, manholes and so on).
Schedules of work are typically prepared by designers rather than by a cost consultant or quantity surveyor. They may be prepared as part of the production information alongside drawings, specifications, bills of quantities and preliminaries and are likely to form part of the tender documentation and then contract documents.
They simply list the work required. Any information about quality should be provided by reference to specifications, and information about location and size should be provided on drawings (so as to avoid conflicting information). Where a schedule does include a description of the work required, this may be referred to as a 'specified schedule of work'.
Schedules of work should allow the contractor to identify significant work and materials that will be needed to complete the works and to calculate the quantities that will be required. As a consequence, it is important that schedules of work properly describe every significant item of work to which they relate. Failure to do so may result in a claim by the contractor.
Schedules of work can be arranged on an elemental basis (for example, groundwork, concrete, masonry, etc.), or on a room-by-room basis.
[edit] Mortgage requirements
Landlords and property investors that purchase properties in need of renovation may require a schedule of works to demonstrate works that have been completed. This is often crucial in convincing a property surveyor that the value is not what the developer paid, but has increased - because of the works.
The lender may also ask the valuer to assess whether the works have been completed and if they are of the value suggested. It is important therefore to have a copy of any receipts and invoices from contractors available to be provided to the valuer.
[edit] Related articles on Designing Buildings
- Contract documents.
- Contractor's working schedule.
- Form of tender.
- Measurement.
- Preliminaries.
- Schedule.
- Scope creep.
- Scope of work.
- Specifications.
- Tender documents.
- What should be included in a scope of work?
- Window and door schedules.
[edit] External references
BIM Directory
[edit] Building Information Modelling (BIM)
[edit] Information Requirements
Employer's Information Requirements (EIR)
Organisational Information Requirements (OIR)
Asset Information Requirements (AIR)
[edit] Information Models
Project Information Model (PIM)
[edit] Collaborative Practices
Industry Foundation Classes (IFC)
Comments
Do you please have an article that compares and contrasts the Schedule of Works with the Bill of Quantities (in terms of advantages/disadvantages/use cases/who creates them and why)? Many thanks :)
You might find some information here https://www.designingbuildings.co.uk/wiki/Advantages_of_a_bill_of_quantities