Time management in the construction industry
Contents |
[edit] Introduction
Time management is the conscious organisation and management of time, a way of planning to ensure that the work undertaken achieves the desired goals in the time available. Effective time management allows people and teams to work smarter and more efficiently, possibly leading to more work being done in less time. But it does not necessarily mean they work harder.
Time management usually involves selection and prioritisation – choosing which tasks to do first can contribute to the overall daily (or hourly) goals and prioritising them in terms of those which need to be completed before the others.
As a discipline, time management is a core component of project management (in particular to project planning and scheduling). Within organisations, time management aims to identify, value and reduce the cost of wasted time.
Although regarded by many as a tool for business or work activities, time management can be applied as effectively to control and organise all aspects of an individual’s personal life. This can include work, social life, family, personal interests and commitments.
Setting goals and priorities is a key part of time management; without them efforts can lack direction and be wasteful of time.
[edit] Benefits of time management
- Better control of time – less time spent on non-priorities.
- Increased productivity
- Less stress
- More time available to do other things.
[edit] Key skills that can contribute to better time management
- Setting goals
- Prioritisation
- Motivation
- Focussing on the task at hand
- Planning
- Stress management
- Recording and monitoring
- Improving – getting better at what you do.
[edit] Time management theories and practices:
- Eisenhower Method
- Pareto analysis and the Pareto Principle.
- Managing emails.
[edit] Eisenhower Method
In business management, one of the more established time management techniques is the Eisenhower analysis which divides tasks into four categories:
- A – Urgent and important e.g car engine fire
- B – Important but not urgent e.g exercise
- C – Unimportant but urgent e.g some interruptions
- D – Unimportant and not urgent e.g salesman’s cold call.
Some proponents of this method of time management argue that B can be put into either A or C.
[edit] Pareto analysis
Pareto analysis is a statistical decision-making technique which identifies that a limited number of inputs (chosen from numerous options) will have a greater impact on outcomes. It is based on the Pareto Principle (referred to as the 80/20 Rule) first put forward by Alfredo Pareto in the 19th century. Basically, it stipulates that 80% of the outputs will result from 20% of the inputs.
As Pareto analysis can be applied to many areas of human endeavour, it can mean, for example that:
- 80% of results come from just 20% of the work.
- 80% of the peas in Pareto’s garden were produced by only 20% of the peapods he planted.
- 80% of a project’s benefits are delivered from 20% of the work completed.
- 80% of profits can come from 20% of the products made.
For further details of how it can be applied to construction, see Pareto analysis in construction.
[edit] Managing emails
Reading, absorbing and responding to emails can consume large amounts of time. One study found that one in three office workers suffers stress from emails. Making a decision when an email has been opened – scanned, not necessarily read in full – can contribute to good time management. One system employs the four Ds (the 4D method):
- Delete – it is thought that around half of emails received can be quickly deleted.
- Do – only if the email is urgent or can be quickly dealt with.
- Delegate – (where possible) if the email can be better processed by another person.
- Defer – set a time to look at emails that will take longer to deal with.
[edit] Related articles on Designing Buildings Wiki
- Acceleration.
- Benchmarking.
- Contingency theory.
- Critical path method.
- Gantt chart.
- Key performance indicators.
- Line of balance (LOB).
- Milestones.
- Pareto analysis in construction.
- Plan, Do, Check, Act (PDCA).
- Project crashing.
- Project manager.
- Project quality plan PQP.
- Quality in construction projects.
- Quality Management System.
- Resource leveling.
- Time-location chart.
- Time management of construction projects.
- Transition time.
- Value management.
- Work breakdown structure
Featured articles and news
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.