[edit] General and consumer contracts
Standard Form Contracts are agreements that employ standardised, non-negotiated provisions, usually in pre-printed forms. These are sometimes referred to as 'boilerplate contracts', 'contracts of adhesion', or 'take it or leave it' contracts.
The terms may be drafted (or selected) by or on behalf of one party to the transaction – generally the party with superior bargaining power who routinely engages in such transactions. With few exceptions, the terms are not negotiable by the other party.
Standard form, business-to-consumer contracts fulfil an important efficiency role in the mass distribution of goods and services. These contracts have the potential to reduce transaction costs by eliminating the need to negotiate the many details of a contract for each instance a product is sold or a service is used. However, these contracts also have the ability to trick or abuse consumers because of the unequal bargaining power between the parties.
For example, where a standard form contract is entered into between an ordinary consumer and the salesperson of a multinational corporation, the consumer typically is in no position to negotiate the standard terms; indeed, the company’s representative often does not have the authority to alter the terms, even if either side to the transaction were capable of understanding all the terms in the fine print. These contracts are typically drafted by corporate lawyers far away from where the underlying consumer and vendor transaction takes place.
The danger of accepting unreasonable terms is greatest where drafters of such contracts present consumers with attractive terms on the visible or 'shopped terms of most interest to consumers, such as price and quality, but include one-sided terms benefiting the seller into the less visible, fine print clauses least likely to be read or understood by consumers.
In many cases, the consumer may not even see these contracts until the transaction has occurred. In some cases, the seller knows and takes advantage of the knowledge that consumers will not read or make decisions on these terms.
[edit] Construction contracts
In the construction industry, there are a number of standard contracts, subcontracts, warranties and appointment agreements published by organisations such as the Joint Contracts Tribunal (JCT), the Royal Institute of British Architects (RIBA), the Institution of Civil Engineers (ICE), and so on. Such agreements can be useful as they have a track record of being used between parties, and their precise meaning has been tested by case law.
English law does not require a particular form to contracts, and so the terms and ultimately the risk allocation is the choice of the parties involved. Standard Form Contracts (SFC) aim to minimise the time and cost of negotiating contracts.
Purpose-written, or bespoke contracts are often considered inadvisable because of the risk they may not adequately or fairly make provision for all circumstances, and that they are not supported by a history of case law. Their continued use however is a reflection of how inflexible some parts of the industry perceive standard forms of contract to be.
Amendment of standard contracts should be approached with reluctance and caution as they can disrupt the balance of risk and impact on the true purpose. See Modifying clauses in standard forms of construction contract for more information.
NB: The Housing Grants, Construction and Regeneration Act applies to all contracts for 'construction operations' (including construction contracts and consultants’ appointments). The Act sets out requirements relating to payment and adjudication. The Scheme for Construction Contracts (England and Wales) Regulations (also known as The Scheme for Construction Contracts) is a scheme which applies when construction contracts do not comply with the Housing Grants, Construction and Regeneration Act. The Scheme either supplements the provisions of the contract where it has deficiencies relative to the requirements of the Housing Grants, Construction and Regeneration Act, or replaces the contract where it is non-compliant.
[edit] Related articles on Designing Buildings
- Addendum.
- Bespoke construction contract.
- Clause.
- Construction contract.
- Housing Grants Construction and Regeneration Act.
- Procurement route.
- Scheme for Construction Contracts.
- Main contract.
- Modifying clauses in standard forms of construction contract.
- Non-performance.
- Notifications during construction works
- Traditional contract - pros and cons.
[edit] External references
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.