[edit] General and consumer contracts
Standard Form Contracts are agreements that employ standardised, non-negotiated provisions, usually in pre-printed forms. These are sometimes referred to as 'boilerplate contracts', 'contracts of adhesion', or 'take it or leave it' contracts.
The terms may be drafted (or selected) by or on behalf of one party to the transaction – generally the party with superior bargaining power who routinely engages in such transactions. With few exceptions, the terms are not negotiable by the other party.
Standard form, business-to-consumer contracts fulfil an important efficiency role in the mass distribution of goods and services. These contracts have the potential to reduce transaction costs by eliminating the need to negotiate the many details of a contract for each instance a product is sold or a service is used. However, these contracts also have the ability to trick or abuse consumers because of the unequal bargaining power between the parties.
For example, where a standard form contract is entered into between an ordinary consumer and the salesperson of a multinational corporation, the consumer typically is in no position to negotiate the standard terms; indeed, the company’s representative often does not have the authority to alter the terms, even if either side to the transaction were capable of understanding all the terms in the fine print. These contracts are typically drafted by corporate lawyers far away from where the underlying consumer and vendor transaction takes place.
The danger of accepting unreasonable terms is greatest where drafters of such contracts present consumers with attractive terms on the visible or 'shopped terms of most interest to consumers, such as price and quality, but include one-sided terms benefiting the seller into the less visible, fine print clauses least likely to be read or understood by consumers.
In many cases, the consumer may not even see these contracts until the transaction has occurred. In some cases, the seller knows and takes advantage of the knowledge that consumers will not read or make decisions on these terms.
[edit] Construction contracts
In the construction industry, there are a number of standard contracts, subcontracts, warranties and appointment agreements published by organisations such as the Joint Contracts Tribunal (JCT), the Royal Institute of British Architects (RIBA), the Institution of Civil Engineers (ICE), and so on. Such agreements can be useful as they have a track record of being used between parties, and their precise meaning has been tested by case law.
English law does not require a particular form to contracts, and so the terms and ultimately the risk allocation is the choice of the parties involved. Standard Form Contracts (SFC) aim to minimise the time and cost of negotiating contracts.
Purpose-written, or bespoke contracts are often considered inadvisable because of the risk they may not adequately or fairly make provision for all circumstances, and that they are not supported by a history of case law. Their continued use however is a reflection of how inflexible some parts of the industry perceive standard forms of contract to be.
Amendment of standard contracts should be approached with reluctance and caution as they can disrupt the balance of risk and impact on the true purpose. See Modifying clauses in standard forms of construction contract for more information.
NB: The Housing Grants, Construction and Regeneration Act applies to all contracts for 'construction operations' (including construction contracts and consultants’ appointments). The Act sets out requirements relating to payment and adjudication. The Scheme for Construction Contracts (England and Wales) Regulations (also known as The Scheme for Construction Contracts) is a scheme which applies when construction contracts do not comply with the Housing Grants, Construction and Regeneration Act. The Scheme either supplements the provisions of the contract where it has deficiencies relative to the requirements of the Housing Grants, Construction and Regeneration Act, or replaces the contract where it is non-compliant.
[edit] Related articles on Designing Buildings
- Addendum.
- Bespoke construction contract.
- Clause.
- Construction contract.
- Housing Grants Construction and Regeneration Act.
- Procurement route.
- Scheme for Construction Contracts.
- Main contract.
- Modifying clauses in standard forms of construction contract.
- Non-performance.
- Notifications during construction works
- Traditional contract - pros and cons.
[edit] External references
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems as first project of the newly formed Labout government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.