Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, defines the Construction Product Approval Process (CPAP) as: ‘An adaptation of Production Part Approval Process (PPAP) that is aimed at those enterprises that will feed construction with new componentry for offsite builds.’
The Production Part Approval Process is: ‘A process, standardised by both the automotive and aerospace industries, that outlines the steps and requirements for approval of production designs and/or manufacturing processes throughout the product development cycle. It also ensures that the entire supply chain understands these steps when procuring externally manufactured parts.’
[edit] Related articles on Designing Buildings
- Advanced product quality planning.
- Bill of quantities breakdown structures.
- Construction Innovation Hub.
- Construction quality planning.
- Plan, Do, Check, Act (PDCA).
- Poka-yoke.
- Product Breakdown Structure.
- Product design requirements.
- Product validation.
- Project quality plan.
- Quality control.
- Quality in construction projects.
- Quality.
- Six Sigma.
Featured articles and news
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
AI and automation in 3D modelling and spatial design
Can almost half of design development tasks be automated?
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
The maintenance challenge of tenements.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.