Preparation and brief project stage
NB the RIBA Plan of Work 2020 renamed this stage 'Preparation and briefing'.
The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments.
However, there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages actually include (see comparison of work stages), and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
‘Preparation and brief’ is a new phrase coined by the Royal Institute of British Architects (RIBA) for their 2013 Plan of Work. This plan comprises eight work stages, and its new terminology, stage referencing system and lack of detail have generated some criticism.
- 0 - Strategic definition.
- 1 - Preparation and brief.
- 2 - Concept design.
- 3 - Developed design.
- 4 - Technical design.
- 5 - Construction.
- 6 - Handover and close out.
- 7 - In use.
The preparation and brief stage involves:
- Developing an initial project brief. This may include; considering feedback from previous projects, defining overall spatial requirements, carrying out surveys and quantifying the budget.
- Carrying out feasibility studies.
- Undertaking a project risk assessment, including; planning risks, programme and procurement strategy.
- Assembling the project team and defining their roles and responsibilities.
This preparatory work enables the design process to begin in the next stage ‘concept design’.
The RIBA suggest that this new stage 1 merges the ‘residual’ tasks from the former Stage A ‘Appraisal’ and Stage B ‘Design Brief’.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Briefing documents.
- Comparison of work stages.
- Designing Buildings Wiki Project plans.
- Design responsibility matrix.
- Feasibility studies.
- Project brief.
- RIBA Plan of Work.
- Risk assessment.
[edit] External references
Featured articles and news
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Tackling the lack of knowledge or confidence in heat pumps
The CICV Green Home Festival part of the Edinburgh Fringe.
Home improvements swapped for green energy upgrades
As applications down since and desire to reduce bills up.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
The Use of Natural Insulation Materials in Retrofit
New paper from STBA with support from SDF.
National Retrofit Hub in partnership with InstallerSHOW.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Biodiversity and the built environment digital series
The nature of building, with CIOB and CWP.
A call for prevention and sensitive re-use.
Risks to the long-term effectiveness of the BNG scheme
National Audit Office publish review of Biodiversity Net Gain.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Building Safety recommendations and Northern Ireland
The NI roadmap to improving safety in high rise residential.
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.