Water systems are present in almost every building. These typically include domestic water systems (which provide potable hot and cold water) and central heating systems.
Some buildings also have chilled water systems to provide space cooling. Central heating and chilled water systems are often referred to as closed loop systems.
Some buildings also have decorative water features such as fountains and industrial features such as vehicle washing facilities, landscape watering, and leisure facilities such as pools and spas. Additionally, water systems may be installed or brought into the building by users, for example drinking water dispensers and humidifiers.
Owners and operators of such buildings should have a plan to ensure all these water systems are safe for the users, including visitors, employees and contractors.
[edit] A holistic approach to water safety
In 2011, the World Health Organization (WHO) published Water Safety in Buildings. This publication offers guidance specific to water safety in buildings with the adoption of water safety planning.
The document recommends three components in the development of a water safety plan:
- Assessing the system to determine whether the provider as a whole can deliver water of a sufficient quality.
- Monitoring control measures in the supply chain that are of particular importance in securing water safety.
- Adopting a management approach that describes the actions to be undertaken from normal conditions to extreme events and relays how they will be communicated to the various stakeholders.
[edit] BS 8680:2020
Each of these three components were integrated into a British Standard, BS 8680:2020 Water quality. Water safety plans. Code of practice. The standard was published in May 2020.
This code of practice follows the aforementioned WHO guidance and integrates some specificities encountered in the UK legislation and regulations (and therefore goes beyond the simple legionella risk assessment encountered in most buildings and workplaces). It looks at all water systems, assessing their risk, monitoring the identified mitigation measures for these risks and outlining the implementation of an adequate management scheme.
[edit] Water Safety Plan (WSP) and Water Safety Group (WSG)
The code of practice is wrapped up into a Water Safety Plan (WSP) supported by a Water Safety Group (WSG). This approach holistically covers the entire lifespan of a building from its conception and design up to its alteration or decommissioning.
A water safety plan can be developed by carrying out three key steps:
- Assessing the water systems. What systems are present? Where are they? Who uses them?
- Monitoring the control measures. How to monitor? When to inspect?
- Managing with adequate communication. Who is responsible? What decisions are made?
To sustain this plan would require suitable people to be involved during these various steps. These people would form part of the water safety group. Some people may take part permanently due to their level of responsibility associated with the water systems (for example the building owner) and some may take part only occasionally (for example external consultants or water experts).
[edit] Water system failures
We often investigate water system failures that could have been prevented or their catastrophic consequences mitigated by an adequate WSP supporting by a WSG.
Failures are often encountered in a building during the first couple of years of operation. The operation team or building owner blames the design and construction team for the failures, and the design and construction team blames the operator or owner for not having correctly run and maintained the systems in their early life. Clearly all these parties should take part in the WSG and work together in producing a realistic WSP, otherwise it is a recipe for disaster!
One element the BS 8680 code of practice recommends for improving collaboration between various parties and stakeholders is the use of a Soft Landings approach. The BSRIA Soft Landings Framework can be found in the guidance document BG 54/2018 which is free to download to all members on the BSRIA website.
This approach will assist project teams, clients and building owners in the development of a WSP, identification of persons to include in a WSG and emphasises the importance of a planned handover when the building is completed.
Another element the BS 8680 code of practice stresses in the development of a successful WSP is to focus not solely on drinking water quality but also on the overall safety of other water systems in a building.
For instance, a lack of heating in a public place may result in visitors being unable to attend during the winter period (and resulting in reputation damage). Another problem could be a lack of cooling, which may be critical to industrial units (and may have negative consequences related to their safe operation). Both examples ultimately have a financial impact on the business activity either directly (the industrial unit having to stop) or indirectly (the public not visiting shops/retailers).
As with any plan, if it is not correctly prepared by competent people, it is likely to fail, possibly with severe consequences. This is why it is important to have a trail to follow and also to have suitable guidance to help avoid pitfalls.
Therefore, it is essential to first define what is to be achieved by having a water safety plan: Is it a business objective? A compliance requirement? A strategic positioning on the market?
The next step would be to develop the plan, involving the relevant people by following the key steps of the code of practice.
Finally, the success of the WSP should be regularly evaluated, members of the WSG should be rewarded for their effort and the whole process should be reviewed for improvements. In other words, it is advisable to follow the process defined in BG 74/2019 Success Criteria for Soft Landings Projects.
This article originally appeared on the BSRIA website. It was written by Martin Ronceray BSRIA Engineering Investigations Lead and published in July 2020.
--BSRIA
[edit] Related articles on Designing Buildings
- Back to the workplace: are you prepared?
- BS 8680:2020 Water quality. Water Safety Plans. Code of practice.
- BSRIA articles on Designing Buildings Wiki.
- Building performance evaluation.
- Commissioning building systems.
- Defects liability period.
- Drinking water quality.
- Soft landings.
- Soft landings and business-focused maintenance.
- Soft Landings for owners.
- Water.
- Water safety plan WSP.
[edit] External resources
- British Standard BS 8680:2020 Water quality. Water safety plans. Code of practice.
- BSRIA Guide BG 74/2019 Success Criteria for Soft Landings Projects.
- BSRIA Guide BG 29/2020 Pre-Commission Cleaning of Pipework Systems 6th edition.
- BSRIA Guide BG 50/2013 Water Treatment for Closed Heating and Cooling Systems.
- BSRIA Guide BG 33/2014 Illustrated Guide to Hot and Cold Water Services.
- BSRIA Guide BG 53/2016 Business-Focused Maintenance.
- BSRIA Guide BG 54/2018 Soft Landings Framework 2018.
- BSRIA Guide BG 57/2015 Legionnaires' Disease - Risk Assessment.
- BSRIA Guide BG 58/2015 Legionnaires' Disease - Operation and Maintenance Log Book.
- BSRIA Guide BG 2/2010 Commissioning Water Systems.
- World Health Organization, Water safety in buildings, March 2011.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.