BS 8680:2020 Water quality. Water Safety Plans. Code of practice
Contents |
[edit] Introduction
The British Standards Institution (BSI) is the UK National Standards Body (NSB). British Standard BS 8680:2020, Water quality. Water safety plans. Code of practice, came into effect on 31 May 2020. It is available to purchase from the BSI shop.
[edit] WHO’s WSP guidance
In 2011, the World Health Organization (WHO) published Water safety in buildings. This report offers guidance specific to water safety in buildings with the adoption of water safety planning (WSP), which it defined as ‘A comprehensive risk-assessment and risk management approach that encompasses all steps in water supply, from catchment to consumer.’
Recommendations in the WHO WSP report have been applied throughout the world and are supported by the Drinking Water Inspectorate (DWI) of England and Wales.
In its efforts to ensure the quality of water supplied up to the point of use, the WHO report recommends three components of a WSP, which were integrated into BS 8680:2020 Water quality. Water safety plans. Code of practice:
- Assessing the system to determine whether the provider as a whole can deliver water of a sufficient quality. What systems are present? Where are they? Who uses them?
- Monitoring control measures in the supply chain that are of particular importance in securing water safety. How should this be monitored? When should it be inspected?
- Adopting a management approach that describes the actions to be undertaken from normal conditions to extreme events and relays how they will be communicated to the various stakeholders. Who is responsible? What decisions are made?
[edit] BS 8680:2020 scope
In addition to the WHO WSP guidance, the BS 8680:2020 code of practice integrates some specifics encountered in UK legislation and regulations (and therefore goes beyond the simple legionella risk assessment encountered in most buildings and workplaces). It also cross references BS 8580-1:2019 Water quality. Risk assessments for Legionella control. Code of practice, which deals with the risk assessments for Legionella.
BS 8680:2020 looks at all water systems, assessing their risk, monitoring the identified mitigation measures for those risks and outlining the implementation of an adequate management scheme.
The standard is designed to be used by anyone involved in ensuring water is safe and fit for purpose at the point of use. This includes those responsible for:
- Design and specification.
- Construction and installation.
- Commissioning.
- Maintenance.
- Operation.
- Alteration and refurbishment.
- Deconstruction.
As indicated by the intended audience of the standard, its guidance covers the entire lifespan of a building - from conception and design to alteration or decommissioning.
[edit] Related articles
- British Standards Institution BSI.
- Back to the workplace: are you prepared?
- Drinking Water Inspectorate.
- Legionnaires' disease.
- Ofwat.
- Planning for water safety in buildings and workplaces.
- Water safety plan WSP.
[edit] External resources
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.