Levelling the playing field
The Electrical Contractors' Association (ECA) has long maintained a view on what constitutes standard industry practice in contracting.
Its perspective is informed by enquiries from nearly 3,000 specialist contractors. ECA is therefore able to highlight ostensibly onerous practices within an industry where contracts can be unforgiving.
In the construction and facilities management sectors, clients attempt to dictate the terms and conditions upon which ECA Members are engaged to carry out their work.
There are two ways in which ECA Members are commonly asked to enter into contracts with their clients, namely:
- Modified standard form of contracts i.e. JCT or NEC.
- In-house bespoke terms and conditions which are procured as an investment in commercial risk protection by the client in question.
There are two reasons why modified standard forms or bespoke forms of contract come about:
- To recognise specific project risks, e.g. if the project is on a high security risk site, there may be additional contractual requirements surrounding security;
- Commercial risk transfer: in order to de-risk the commercial model of their own business, clients will often seek – either through standard form modifications or bespoke terms – to push as much commercial risk downwards within the contractual chain as possible.
The latter approach is intended to safeguard the profitability of their businesses, but it will often pass on unmanageable and overly onerous risk to the party carrying out the works.
ECA has published a guidance document that identifies common areas of standard form contracts (which broadly represent the industry norm for what is acceptable risk allocation) and/or bespoke terms and identifies where those issues are modified to an ECA Member’s detriment.
The document also outlines the risk of those types of clauses; it suggests a risk-proportionate approach and rationale for finding and negotiating a compromise which aligns the risks involved with the parties who are realistically and proportionately in a position to manage those risks.
ECA wishes to identify and inform the engineering services sector and ECA Members’ decisions on what ‘fair, reasonable and good contractual practice’ looks like. ECA remains committed to fair and open competition and this document is not designed in any way to dictate what may be an appropriate risk allocation for a specific project, or act as a substitute for ECA Members obtaining project and context-specific legal advice.
ECA Members can click here to view ECA guidance on what are considered onerous contractual practices and how to handle them.
[edit] About this article
This article was written by Rob Driscoll, ECA Director of Legal and Business. It was previously published on the ECA website in August 2019 and can be accessed here.
[edit] Related articles on Designing Buildings Wiki
- Bespoke construction contract
- Complex project.
- Concession Contracts Regulations.
- Constructing Excellence contract
- Contract documents for construction
- Core clause.
- Intermediate building contract
- JCT
- JCT Construction management contract
- Modifying clauses in standard forms of construction contract
- NEC Option A: Priced contract with activity schedule
- NEC3
- Non-performance.
- PPC 2000
- Procurement plan.
- Procurement route
- Procurement team
- Risk allocation.
- Standard form of contract
- Traditional contract for construction
- Traditional contract: tender
- Typical tender process for construction projects
--ECA
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.