King's Cross station was designed by Lewis Cubitt in 1852 and was the largest single-span structure in Europe. The roof is 105ft wide by 800ft long and was originally supported by laminated timber. However, this was subsequently replaced by steel. (Durant, 2010)
Almost 40 million passengers use King's Cross every year and this number is likely to increase. Redevelopment of the station was announced in 2005. The £400m Plans included restoration of the existing grade I listed building, incorporation of the King's Cross St Pancreas London underground station and a new station concourse that would create an inspiring new entrance to the city. (Arup, 2012)
In 2006, planning permission was granted to redevelop the station and regenerate the surrounding areas, totaling some 8 million sq. ft. The development includes a variety of uses such as a new University and a large amount of public space straddling Regent's Canal. Arguably, this regeneration will create one of the most significant changes to London in 300 years. (Littlefield, 2012) (King's Cross Central Limited Partnership, 2012). This part of the project is expected to continue beyond 2020 and many of the details are still unknown.
The core challenge of the project was to bring the station into the 21st century and provide a futue-proof transport hub suitable for an ever growing city, whilst retaining the original features of the grade I listed building.
[edit] Constraints
There were a number of constraints to the way the development:
- It was decided that an essential aim of the project would be to have the vast majority of infrastructure in place for the London Olympics in 2012. It was anticipated that during the Olympics there would be an even greater number of people in the city, and increased pressure on the transport network. The Olympics also provided an opportunity to showcase the development to the world. This meant that the project had to be completed within five years, whilst minimising disruption to the existing station and transport network.
- There were significant environmental concerns relating in particular to carbon emissions and waste generation.
- King's Cross is a grade I listed building, meaning that it cannot be unjustly altered or demolished and that features of the building must be retained for heritage purposes.
- Economic constraints, particularly given the economic conditions at the time when the development was underway.
- Social responsibilities such as keeping the disruption of existing services to a minimum and consulting with community stakeholders.
- The health and safety of the workforce and general public.
- Transparency and the provision of publicly available information
[edit] Parties and Disciplines Involved
- John McAslan + Partners were the architects for the project (Arup, 2012)
- Network Rail Ltd was the client for the redevelopment of King's Cross station.
- King's Cross is being developed by the King's Cross Central Limited Partnership which brings together three groups; Argent King's Cross Limited Partnership, London & Continental Railways Limited (LCR) and DHL Supply Chain. (King's Cross Central Limited Partnership, 2012)
- Arup was the lead consultant on the project. They provided transport planning, multi-disciplinary engineering services, security, IT, lighting design, acoustics, visualisation and pedestrian modelling. (Arup, 2012)
- A number of contractors were used during the construction phase of the project; Companies included Carillion, BAM Nuttall, BAM Construct and Kier group. (King's Cross Central Limited Partnership, 2012).
- In order to ensure that the obligations of the redevelopment of King's Cross were met, Network Rail appointed Turner & Townsend to provide an overarching commercial management service. Turner & Townsend set up an experienced management team which took charge of procurement and cash flow. As well as this, Turner & Townsend supported Network Rails own project management team when dealing with other aspects of the project such as the environment. (Turner& Townsend plc , 2011) The appointment of this third party company to provide project management is an example of a multi stake holder approach which promotes democracy, transparency and accountability.
The redevelopment of King's Cross was a huge project and incorporated many aspects of civil engineering including project planning, transport planning and pedestrian modelling as provided by Arup. As well as this, geotechnical engineering was involved in the incorporation of the underground aspects of the existing transport network in London. Lighting design and acoustics were also vital and mechanical and electrical engineering services were needed to provide energy, information and connectivity.
[edit] Analysis of the Project
As a system the project can be broken down into a number of different elements and sub elements.
Figure 1; overall system
Figure 2; concourse sub-element
[edit] Conclusion
As the project is still on-going, it is difficult to gauge how well it has achieved its goals.
The core challenge of the project was to bring an ageing station into the 21st century and to provide a future proof transport hub, whilst retaining the original features of the building. The project was also required to be complete for the London Olympics whilst limiting disruption to existing services. These goals have been achieved. The new station and concourse was open months in advance of the Olympics and Network Rail claim that not one single train was cancelled during construction (Network Rail, 2012). The new concourse seamlessly incorporates the heritage of King's Cross into an awe inspiring entrance to an improving and expanding city.
[edit] Related articles on Designing Buildings
- 22 Bishopsgate.
- A heritage partnership agreement for King's Cross Station.
- Barking Riverside development landscape.
- Battersea Arts Centre.
- Battersea Power Station.
- Brownfield land.
- Community group.
- Crossrail 2.
- Digital 21st century - Ramboll.
- Dust heap.
- Enterprise zones.
- Health and wellbeing at Kings Cross.
- Heathrow Terminal 5.
- Hertsmere House project.
- London 2012 Olympic Stadium.
- Millennium Mills.
- Mixed use development.
- Old Buildings, New Architecture.
- Planning permission.
- Railway stations.
- Regeneration.
- Thames barrier.
- Wembley Park.
[edit] External references
- Arup, 2012. Fast Facts. [Accessed 11 12 2012].
- Arup, 2012. Kings Cross Station. [Accessed 06 12 2012].
- Ashley, R., 2012. The role of the civil engineer in society: engineering ethics and major projects. ICE Civil Engineering , 165(CE3), p. 99.
- Doherty, A., Dora, J. & Newsome, C., 2012. Enhancing Britains Railway Infrastructure. Civil Engineerings Special Issue, 165(CE6), pp. 20-26.
- Durant, S., 2010. Victorian Railway Stations. [Accessed 06 12 2012].
- Hawkins, J. & McKittrick, B., 2012. Construction Sector Transparency Initiative: making construction more accountable. ICE Civil Engineering Proceedings, 165(CE2), pp. 82-88.
- Holgersen, S. & Haarstad, H., 2009. Class, Community and Communicative Planning: Urban Redevelopment at Kings Cross London. Antipode, 41(2), pp. 348-370.
- King's Cross Central Limited Partnership, 2012. The Development. [Accessed 07 12 2012].
- King's Cross Central Limited Partnership, 2012. Who's Developing King's Cross. [Accessed 11 12 2012].
- Littlefield, D., 2012. London (Re) Generation. Architectural Design, 82(1), pp. 32-35.
- Rostron, J., 2001. Environmental Law for the Built Environment. 1st ed. London: Cavendish Publishing.
- Turner& Townsend plc , 2011. Network Rail - King's Cross Station redevelopment programme. [Accessed 07 12 2012].
Featured articles and news
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA has launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.