Fit out of buildings
Contents |
[edit] Introduction
‘Fit out’ is a term used to describe the process of making interior spaces suitable for occupation. It is often used in relation to office developments, where the base construction is completed by the developer, and the final fit out by the occupant. The occupant will generally be leasing space as a tenant from the developer/landlord.
Approved document L of the building regulations defines fit out as:
...that Work needed to complete the internal layout and servicing of the building shell to meet the specific needs of an incoming occupier. The building shell is the structural and non-structural envelope of a building provided as a primary stage (usually for a speculative developer) for a subsequent project to fit out with internal accommodation works. |
Depending on the degree of completion of the building, and the interior specification required by the occupant, fit outs can take a range of different forms:
[edit] Shell and core
Shell and core works will generally comprise the structure, cladding, base plant, completed common areas and external works. It will include fitted-out main reception, lobbies, staircases, toilets, lift shafts, basements, loading bays, car parking, and so on.
[edit] Category A fit-out
Category A (Cat A) generally describes the level of fit out that the tenant's own space is completed to by the developer. There is no standard definition, but a category A fit out may include.
- Raised floors and suspended ceilings.
- Distribution of mechanical and electrical services.
- Internal surface finishes.
- Blinds.
If the tenant has very complex fit out requirements, this may impact on the category A fit out. In this case, they may make a contribution to the costs of the category A fit out to ensure that it meets their needs, and offset this against their own costs. This saves wasted time and money modifying the category A fit out.
For more information see: Category A works.
[edit] Category B fit-out
Category B (Cat B) completes the fit out of the internal space to the tenant's requirements. This may include:
- Final finishes and branding.
- Installation of offices.
- Installation of specialist facilities in meeting rooms, board rooms conference rooms, and so on.
- Fitting out reception areas.
- Installation of specialist lighting.
- Installation of ICT equipment.
- Installation of audio visual equipment.
- Fit out of kitchen areas.
- Installation of furniture.
The developer may make ask the tenant to carry out some of their more sensitive category A works on their behalf during the category B fit out, when they may be less subject to damage. The developer will pay the tenant a sum equivalent to the cost of the works had they carried them out themselves.
For more information see: Category B works.
[edit] Turnkey developments
A turnkey development provides the tenant with spaces that are fitted out by the developer so that they are ready for use.
These categories do not have standard definitions, and so it is very important that contract documentation sets out precisely what work is to be carried out and by who, rather than relying on ambiguous short-hand terms.
An agreement to lease between landlord and tenant should clearly define:
- What comprises the shell and core built by the developer, including space provision in common areas for tenant equipment such as standby generators, extra chillers, or uninterrupted power supply plant.
- What constitutes category A fit out installed by the tenant but funded by the developer/landlord.
- What tenant equipment is to be installed in common areas.
Category A capital allowances might also be a factor in agreement to lease negotiations.
A rent-free period may be provided by the landlord as a notional contribution to the tenant’s fit out. It not unusual for a tenant to start fitting out their areas before completion of the shell and core works, although the rent-free period will be triggered by practical completion of the shell and core works.
The tenant’s fit out may involve rectifying problems in the developer's works. In order to meet the fit-out timetable these may be funded by the tenant who may then make a claim to recover their costs.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.
The interesting point is who claims the capital allowances tax break which can be substantial as 60% of fit out costs can be the cost of mechanical and electrical services which qualify for depreciation and tax relief. Cat A capital allowances might be a negotiating factor in the agreement to lease negotiations.