Fee considerations for architects
This article needs more work. To help develop this article, click 'Edit this article' above.
Contents |
[edit] Background
- The monopolies commission and OFT forced the RIBA to abandon Fee Scales.
- The RIBA are moving towards resource based fee calculation - promoting the RIBA fee calculator as a tool with outputs that can be used to explain fee calculation to clients.
[edit] Project considerations
[edit] ASSESS CLIENT RISK
- How much support will be required? (ie: is the client experienced or not?)
- How many stakeholders are there to satisfy?
- Are there multiple requirements as a result that could complicate the brief?
- Is the client's budget reasonable, can the project be achieved within it?
[edit] ASSESS PROJECT SCOPE
- What is the extent of services required? Full, partial, just feasibility etc?
- Is the client clear about what they want and the brief fully realised? If not suggest a time-based fee for the early stage work then a fixed fee for the whole project. Consider the possibility of 'scope creep'.
- What is the procurement route? Traditional will require more detailed design with possible contract administrator duties.
[edit] ASSESS POSSIBLE LEGISLATIVE RESTRICTIONS
- Does it include work to an existing building or conservation work?
- Are there any possible contentious issues that may cause delays?
- Are the services required beyond your expertise? Will additional consultants be needed?
[edit] ASSESS PREVIOUS EXPERIENCE
- Does the practice have previous experience in the sector? Lack of experience can lead to poor estimation of cost.
- Is there potential to use knowledge from previous projects?
[edit] ASSESS PROJECT PROFILE
- Consider the building type and the level of project complexity. Is it a new build? Refurbishment? Historic? (traditionally refurbishment and historic carry higher fees)
- Consider whether the risk profile of the project is high or low.
- Are there elements of repetition that may reduce the fee?
- Does sufficient information exist about the services being asked for?
[edit] ASSESS CLIENT REQUIREMENTS
- What is the delivery requirement - does the project have to be delivered in BIM or another specific programme / method?
- Consider the speed of delivery required. Is the client's programme reasonable? (This will affect the resourcing demands and is required under RIBA principle 2.5). Fast track projects require additional fees because the architect may need to hire additional staff, pay overtime and re-schedule other work
- Basic fee or additional services? Are contract administrator / lead consultant / lead designer / principal designer roles Included?
[edit] OTHER
- What is being asked for?/ How were you approached?
- How is the project funded, are there other stakeholders/demands to be aware of?
- Likely expenses.
- Is it possible to benchmark against other practices / projects?
- Is there any requirement to give a maximum price?
[edit] Professional obligations
- The fee should be confirmed in writing and explained to client.
- You should have proper resources/ competence for the delivery of the services required.
- You should have appropriate Professional Indemnity Insurance (PII) cover.
- The architect should be satisfied the proposal will not conflict with any relevant codes of professional conduct, or other commissions/commitments in the office.
- The architect must act with reasonable skill and care.
- The architect must keep the client informed of progress in the performance of services and the need to appoint specialists/consultants.
- The architect must collaborate with the project team and integrate their work.
- The architect must act on the behalf of the client where necessary/as set out in the agreement.
[edit] Wider practice / business considerations
- Are there sufficient resources?
- Is additional PII cover required?
- Assess cash flow and fee forecasting.
- Is this a new client?
- What is their financial status?
- Have you performed credit checks and asked about them around the industry?
- Does the client have the authority and resources to commission the work?
- Is the practice likely to get repeat work from this client? If so, the fee could be lowered to it make more appealing.
- Will the client be open to value incentives? If so should the practice take the risk?
- You should have an Employment Policy in place.
- Watch out for bespoke appointments, including a demand for higher levels of skill, breach of performance warranties and stretching of collateral warranties to longer than the appointment lifespan.
- Ensure there is a liability cap.
[edit] Calculation considerations
[edit] Work stage fees
- It is common to time charge during the early stages.
- What is the procurement route?
- Is the appointment for normal service?
- Architects add most value up to planning, but more resources are required in later stages.
[edit] Acknowledging added value
- Incentive fees: (ie % of value increase on land if planning is received.)
- Equity shares.
- Value framework (developer led where fees are agreed traditionally and then expressed as a % of the overall project profit margin).
[edit] Resource calculation
[edit] Empirical data
- Practice records (ie. % fee earning hours. Keep good time sheets)
- Building Cost Information Service
- Colander.
- RIBA Business benchmarking.
[edit] Calculated prediction.
- Provisionally allocate resources and check against practice workload.
- Schedule activates and requirements.
- Identify real costs of staff.
- Identify ancillary costs such as travel, PII, hard/software.
- Direct costs; payroll, NI, pensions, CPD etc.
- Indirect costs; overheads and profit.
Ideally, perform a calculated prediction and test it against empirical data.
[edit] Traditional types of fee
- Percentage fee. Geared towards full services and well-defined projects. Not always suitable.
- Lump sum. Client benefits form certainty. For each work stage or one sum split between work stages.
- Fixed Lump Sum. It may be unwise to a agree fixed lump sum with no variation provision.
- Variable Lump Sum. Adjusted based on updated cost information at the end of each stage.
- Time charge. This is high risk for the client.
[edit] Definition for client
- Fee for basic normal services.
- Fee for additional services.
- Time charge provision.
- Expenses and dispersements.
- If the client has not confirmed the terms of the agreement then include; terms and conditions, other consultant roles, programme matters.
- QA status.
- Specialist skills in house.
- Recent completed projects.
- Staff CVs.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Architect.
- Architecture.
- Architects fees.
- Architectural styles.
- Architectural training.
- Appointing consultants.
- Collaborative practices.
- Concept architectural design.
- Consultant team.
- Consultant team start up meeting.
- Designers.
- Design liability.
- Fees.
- Professional Indemnity Insurance.
- Scope of services.
- The architectural profession.
Featured articles and news
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.