Cost-benefit analysis in construction
A cost-benefit analysis (CBA) is a systematic process in which decisions relating to proposals are analysed to determine whether the benefits outweigh the costs, and by what margin. A CBA serves as a basis for comparing alternatives proposals and making informed decisions about whether to proceed.
In terms of proposed developments, by evaluating all the potential costs, and comparing these with possible revenues and other benefits that might derive from a new building, a developer is able to assess whether the proposal is financially worthwhile or whether an alternative is needed.
The first step typically involves listing, in as much detail as possible, all the costs and benefits that are associated with the project. Costs could include direct and indirect costs, hard and soft costs, opportunity costs and the cost of potential risks. Benefits could include direct and indirect benefits, and intangible benefits (e.g. increased productivity and cost savings). It is better to be conservative with the benefits as an over-estimation (or under-estimation of the costs) will result in an inaccurate CBA.
Once the list has been made, a common unit of monetary measurement should be applied to all the items before quantitatively comparing them to ascertain whether the benefits outweigh the costs. If they do not, then a review should be undertaken to determine how the benefits might be increased and/or the costs decreased to try and make the project financially viable.
If, once this is done, the benefits are still outweighed by the costs, it may be necessary to reassess whether the project should proceed as planned. If the benefits outweigh the costs then the project can be taken forward to the next stage of planning.
As an assessment tool, CBA is of more value for smaller construction projects with a length of time to completion that is short to intermediate. This is because greater accuracy in the cost estimating can be achieved. Larger projects with a long programme may be exposed to more cost uncertainties (e.g. interest rates, inflation, availability of labour, price of materials, etc.). For these larger and more uncertain projects, analysis models that may be more suitable include net present value (NPV) and internal rate of return (IRR).
For more information see:
NB Glossary of Capital Budgeting and Infrastructure Governance, published by the Organisation for Economic Co-operation and Development (OECD) in 2018, states: ‘Cost-benefit analysis is a systematic process for calculating and comparing benefits and costs of a government policy. It has two purposes: a) to determine if it is a sound investment/decision (justification/feasibility); b) to provide a basis for comparing different government policies. It involves comparing the total expected cost of each option against the total expected benefits, to see whether the benefits outweigh the costs, and by how much. Cost-benefit analysis is related to, but distinct from cost-effectiveness analysis. In cost-benefit analysis, benefits and costs are expressed in monetary terms, and are adjusted for the time value of money, so that all flows of benefits and costs over time are expressed on a common basis in terms of their "net present value."’
[edit] Related articles on Designing Buildings
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.