Internal rate of return for property development
Calculating the Internal Rate of Return (IRR) of a project is a widely used method of assessing a potential project’s viability.
It is a similar calculation to Net Present Value (NPV) and Discounted Cash Flow (DCF) in that anticipated future income and expenditure are used to assess whether or not to proceed with a project. The IRR is the percentage which, when applied to future capital costs and receipts, results in a Net Present Value of £Nil.
If project 1 has an IRR of 12% and project 2 an IRR of 8% then project 1 would be selected to proceed as it has a higher IRR.
Usually the project IRR must exceed the cost of capital by an agreed amount so that the risk of proceeding is seen to be within acceptable commercial parameters. It can be seen, therefore that an accurate cash flow projection for a prospective project must be developed before an accurate IRR assessment can be made.
Because the IRR is expressed as a percentage per annum it can be used to assess the Yield of a particular investment.
Most spreadsheet packages have an IRR function which, when applied to a project model cash flow, will calculate the IRR for you.
--Martinc
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.