Internal rate of return for property development
Calculating the Internal Rate of Return (IRR) of a project is a widely used method of assessing a potential project’s viability.
It is a similar calculation to Net Present Value (NPV) and Discounted Cash Flow (DCF) in that anticipated future income and expenditure are used to assess whether or not to proceed with a project. The IRR is the percentage which, when applied to future capital costs and receipts, results in a Net Present Value of £Nil.
If project 1 has an IRR of 12% and project 2 an IRR of 8% then project 1 would be selected to proceed as it has a higher IRR.
Usually the project IRR must exceed the cost of capital by an agreed amount so that the risk of proceeding is seen to be within acceptable commercial parameters. It can be seen, therefore that an accurate cash flow projection for a prospective project must be developed before an accurate IRR assessment can be made.
Because the IRR is expressed as a percentage per annum it can be used to assess the Yield of a particular investment.
Most spreadsheet packages have an IRR function which, when applied to a project model cash flow, will calculate the IRR for you.
--Martinc
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.