Commissioning Air Systems BG 49/2024
Contents |
[edit] Updates to the guide
This guide explains how to functionally test and regulate ventilation systems in buildings. It was updated in 2024 to reflect new technologies and recently published industry guidance. The update was carried out by an expert author and steering group, in partnership with CIBSE and CSA.
The guide includes updated information about Building Regulations, commissioning of VAV and CAV systems, instrumentation and specialised applications such as pressure differential systems, jet nozzles, active chilled beams and hybrid ventilation systems.
The procedures in this guide comply with the standards outlined in CIBSE Commissioning Code A, which was also updated in 2024 and which sets out the normal standards of good practice accepted by the building services industry.
[edit] Sections of the guide cover:
- Design for commissionability
- Functional testing & regulating facilities
- Installing commissionable systems
- Test instruments
- Flow measurement techniques
- Functional testing procedures
- Example methodologies
- Documentation
- Editable Word and Excel versions of the checklists and test sheets in the guide are attached to the pdf, and are available as a free download to users of the guide.
BSRIA would like to thank Comfort Services Group, THV Environmental Services and Ashford Environmental Services for sponsoring the guide.
[edit] Revision History:
- 1988: TM 2/88 A procedure for commissioning variable air volume systems
- 1989: AG 3/89 The commissioning of air systems in buildings
- 1991: AG 1/91 Commissioning of VAV systems in buildings (This one superseded TM 2/88 and was superseded by BG 49/2013)
- 1992: AG 3/89.1 The commissioning of air systems in buildings
- 1998: AG 3/89.2 Commissioning of air systems in buildings
- 2001: AG 3/89.3 Commissioning Air Systems
- 2013: BG 49/2013 Commissioning Air Systems
- 2015: BG 49/2015 Commissioning Air Systems
- 2024: BG 49/2024 Commissioning Air Systems
[edit] BSRIA Instrument Solutions
BSRIA Instrument Solutions offers a range of products and services including equipment rental ideally suited for critical environments. Products include commissioning tools such as airtightness testing systems, volume flow devices and IR / thermal imaging systems. Services includes the calibration of products traceable to national standards under the Instrument Solutions ISO 9001 accreditation or UKAS accredited calibrations against the ISO 17025 standard.
View our wide range of specialist test and measurement instruments for the industry
[edit] Product details
Published: June 2024. Publisher: BSRIA. Author: Keith Barker. ISBN: 978-0-86022-811-0
This article appears on the BSRIA bookshop website as 'Commissioning Air Systems (BG 49/2024)' from June 2024.
--BSRIA
[edit] Related articles on Designing Buildings
- BREEAM Seasonal commissioning
- BS 5839-1: Fire detection and fire alarm system for buildings. Code of practice for design, installation and commissioning and maintenance of systems in non-domestic premises
- BSRIA articles.
- BSRIA Water Treatment for Closed Heating and Cooling Systems BG 50/2021.
- Client commissioning
- Client commissioning of construction works
- Commissioning
- Commissioning building systems
- Commissioning construction works
- Commissioning documents
- Commissioning documentation
- Commissioning notice
- Commissioning plan
- Commissioning planning
- Commissioning v testing
- Initial commissioning
- Optimising Hospital HVAC Systems: AHU Sizing and Air Distribution Strategies
- Planning the commissioning of buildings
- Pumped air heat recovery systems for stoves
- Notice of commissioning
- Seasonal and continuous commissioning of buildings
- Seasonal and continuous commissioning
- Solar air systems
- Specialist commissioning manager
- Warm air systems
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.