Carcassing
![]() |
The World Trade Center Transportation Hub in Lower Manhattan replaces the PATH train station that was destroyed in the 9/11 attacks. Designed by Spanish architect Santiago Calatrava to resemble a dove taking flight, the structure is formed by softly-curving, white, steel ribs that rise from the ground to form an elliptical dome over a vast concourse. The project has not been without its criticism, both for the long delays in delivery, and the design which some likened to the carcass of a turkey. |
Carcassing refers to the main shell, frame or skeletal structure of a building. It may or may not be the overall structural or load-bearing element of a building as it also refers to individual elements rather than only to the whole.
It is included in section G of the common arrangement of work sections classification (CAWS) along with structural elements as Structural / Carcassing Metal (G1) and Structural / Carcassing timber (G2) with subsections covering various different elements in metal;
- G10 Structural steel framing
- G11 Structural aluminium framing
- G12 Isolated structural metal members
- G13 LSF Light Steel Frame
and in timber
- G20 Carpentry/Timber framing/First fixing
- G21 Load-bearing timber blockwork
- G22 CLTP Cross Laminated timber panel system
- G23 Post and Beam frame
- G24 Laminated timber frames
- G25 LTF Light Timber Frame
- G26 SIPS Structural Insulated Panel Systems
- G27 ISPS insulated structural panel system
- G28 Dowelled/Nailed stacked wood panel systems
By example, other items that also come under section G but are not necessarily structural / carcassing elements are;
- G3 Metal/ Timber decking
- G30 Metal profiled sheet decking
- G31 Prefabricated timber unit decking
- G32 Edge supported/Reinforced woodwool slab decking
[edit] Related articles on Designing Buildings
Featured articles and news
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.