Specialist designer for construction projects
As buildings become increasingly complicated, it is more and more common for specialists to be required to design particular aspects.
Specialist designers may be:
- Contractors or suppliers appointed in the first instance to carry out design and subsequently to carry out the works on site or to supply goods or services.
- Appointed by the client to carry out design and then perhaps to monitor works on site.
- Sub-consultants to a member of the consultant team.
Where specialist designers are contractors or suppliers, they may be appointed through a two-stage tender process where the specialist design services are procured in the first stage along with agreed rates, overheads and profit for the the products or services to be supplied in the second stage. The specialist designer might then become a named sub-contractor or nominated sub-contractor, or a named supplier in the main contract. In some cases, this second stage appointment might be made direct by the client (for example for the supply of equipment outside of the scope of the main contract).
A design co-ordinator might be appointed within the consultant team to ensure proper integration and co-ordination of specialist designs into the overall design.
On publicly-funded projects, OJEU procurement rules may apply to the appointment of a specialist designers if the potential cost of either the first or second stage contract exceeds the relevant threshold.
[edit] Related articles on Designing Buildings Wiki
- Building Information Modelling.
- Collaborative practices.
- Consultant team start up meeting.
- Designers.
- Design liability.
- Design management.
- Design manager.
- Lead consultant.
- Lead designer.
- Nominated sub-contractor.
- Named sub-contractor.
- Named supplier.
- OJEU.
- Procurement routes.
- Specialist contractors.
- Specialist contractors start up meeting.
- Structural waterproofing consultant.
[edit] External references
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.