A formal start-up meeting with specialist contractors is an opportunity to:
- Issue appropriate project documentation.
- Agree lines of communication.
- Agree change control procedures.
- Co-ordinate the interface between specialist contractors and the consultant team and agree approval and payment procedures (generally specialist contractor design will be approved and certified by the member of the consultant team with primary responsibility for the that area of the design).
- Agree collaborative practices such as document control, the use of a common data environment, CAD, building information modelling and so on (see collaborative practices for more information).
- Agree meeting schedules.
- Discuss the programme.
- Review design risk management.
- Review design co-ordination and integration procedures.
NB. A design co-ordinator might be appointed within the consultant team to ensure proper integration and co-ordination of specialist contractors designs into the overall design.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.