Design coordinator
Design coordination is a broad term describing the integration of designs prepared by different members of the project team to create a single, unified set of information that can be constructed without clashes between components. Effective design coordination can help to reduce costs, delays and disruption that can be caused by problems on site and the need for remedial or abortive works and redesign.
For more information, see Design coordination.
Where there are a number of different specialist contractors or suppliers involved in the later stages of the design, in particular during the technical design stage, a design coordinator may be appointed to oversee coordination and integration those designs. They can also be known as design managers.
The main tasks of a design coordinator are the establishment of design management protocols and clear communication of expectations and deliverables with designers and design subcontractors. They are also largely responsible for the delivery of fully coordinated design proposals and production information, and must monitor design production so they are able to provide design progress reviews to lead designers, lead consultants, project managers and client teams. In addition, they should be tasked with document management, the distribution of design information to relevant stakeholders, and completion and maintenance of records.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.