Construction skip
Contents |
[edit] Introduction
In construction, a skip is a container that is used for holding waste and debris produced by works such as building, demolition, landscaping, and so on. When full it is loaded onto the back of a lorry and taken away for the waste to be disposed of. A skip may also be used to deliver materials to site before then being used as waste storage.
Skips typically have two trapezoid sides, the shorter edge at the bottom and the longer edge at the top. This results in sloping faces at both ends, sometimes with hinges allowing them to be opened for manual loading or unloading. Lugs on each of the top corners allow chains to be attached so they can be lifted on and off lorries.
[edit] Materials
Skips are suitable for the following materials:
- General waste.
- Inert materials such as concrete, aggregates, ceramics, steel and so on.
- Spoil and soil waste.
- Recyclable materials.
Some of the materials and items that are not suitable for skips include:
- Asbestos and other hazardous materials.
- Batteries, fluorescent tubes, gas canisters, and so on.
- Electrical appliances and equipment.
- Cooling equipment and air conditioning units.
- Liquids such as oil, petrol, paint and so on.
[edit] Skip types and sizes
Types of skip include:
- Open skip: The most common type, which has no top and is often referred to as a ‘builder’s skip’.
- Closed skip: Has a top which makes it more secure and means that it cannot be over-filled.
- Roll-on roll-off (RORO) skip: Similar to open skips but are rolled on and off lorries with a hook rather than being lifted with chains.
- Mobile skip: Set on a four-wheeled trailer.
Skips are available in several different sizes. In the UK, the volume measurement for a skip is still the cubic yard instead of being metric. Sizes include:
- Mini skip: 2 cubic yards (approx. 20-30 bin bags), suitable for small domestic works.
- Small skip: 4 cubic yards (approx. 30-40 bin bags), suitable for small-scale works.
- Small builder’s skip: 6 cubic yards (approx. 50-60 bin bags).
- Large builder’s skip: 8 cubic yards (approx. 60-80 bin bags), this is the most common size.
- Maxi skip: 12 cubic yards (approx. 100-120 bin bags), used for larger works.
[edit] Hiring a skip
Hiring a skip is an important part of site waste management and efficient waste disposal. The larger they are, the are cheaper per cubic yard of waste removed, but if the skip is too large for the amount of waste then it will not be fully used.
When deciding on a skip operator, it is worthwhile checking with the Environment Agency that they are correctly licenced to carry waste. This can be done by acquiring their waste carrier licence number and checking its validity. It may also be sensible to acquire a copy of the operator’s public liability insurance details, in case of accidents or damage to property when delivering or collecting the skip.
If a skip is to be placed on a public highway, a skip hire permit should be applied for and if necessary, a parking suspension put in place. Councils may not permit maxi skips to be placed on a public highway.
Skips will generally have to comply with local authority requirements relating to positioning, signage, lighting and so on.
For more information, see Getting a skip hire permit.
Skips are typically collected within 1 or 2 weeks of them being delivered, but this can generally be adjusted on request. Prices for skip hire will vary depending on locaion, duration, size, the type of material being stored. It is important to ensure that the skip is not overfilled. Instead it should be filled till it is level. If it is overfilled, the operator may charge more to take it away or ask that excess waste is removed.
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February