Seagram Building
Contents |
[edit] Introduction
The Seagram Building is an iconic skyscraper located on Park Avenue in mid-town Manhattan, New York City. It was designed by architect Ludwig Mies van der Rohe in the International Style, which would influence the architectural style of New York’s skyscrapers for several decades.
Characterised by sleek glass and metal, rather than the ornamental heavy stone and brick facades of previous decades, the Seagram Building signalled a new era of functional skyscraper, adopting a minimalist, corporate aesthetic.
The building stands 157 m (515 ft) tall, with 38 storeys and was completed in 1958. It was originally designed as the headquarters for Joseph E. Seagram’s & Sons, and was Mies’ first tall office building project.
Today, it is owned by RFR Holdings and remains a prominent example of mid-century modernist architecture. However, it also has an Energy Star rating of 3 out of 100, the worst of any New York building.
[edit] Architectural design
[edit] Structure
One of the key traits of the International style was to articulate the structure of the building externally, rather than concealing it under applied ornamentation.
The Seagram Building was built using a combination of a steel moment frame and a steel and reinforced concrete core for lateral stiffness, one of the first buildings of its kind to do so. The structural engineering consultants, Severud Associates, claimed it was the first tall building to use high-strength bolted connections, and the first to combine a braced with a moment frame. In addition, it was one of the first buildings of its kind to use a vertical truss bracing system.
Mies had intended for the steel frame to be visible, however, this was prevented by the American building codes which required the covering of all structural steel with concrete or another fire-resistant material. To give the building the vertical articulation he wanted, Mies used non-structural bronze-toned I-beams instead, which run vertically (in the same way as mullions), surrounding the large glass windows, also helping to stiffen the skin for wind loading. This method of a larger non-structural edifice being supported by an interior reinforced concrete shell would go on to be widely adopted for other buildings.
[edit] Window blinds
A characteristic of the International style is the building’s uniform appearance. To avoid the undesirable, disordered irregularity of window blinds being drawn to different lengths, Mies specified blinds which were operationally limited to three positions – fully open, halfway open, or fully closed.
[edit] Interior
It was the use of expensive, high-spec materials and lavish decoration in the interiors which made the Seagram Building the world’s most expensive skyscraper at the time of its completion. The building used 1,500 tons of bronze, in addition to travertine and marble. This was intended to provide cohesion with the sleek, yet minimalist, external aesthetic.
[edit] Plaza
Another pioneering feature of the design was Mies’ decision to set the building back 100 ft from the edge of the street, creating an open plaza. This was part of his response to the dense environment of Manhattan, and was a rebuke to the conventional economics of skyscraper design and urban planning.
The plaza incorporates two large fountains and outdoor seating, encouraging the socialisation of the space, and providing a 'threshold' linking the city with the building.
Such plazas have now become something of an architectural cliché, but at the time it was celebrated as being innovative and unique.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.