Seagram Building
Contents |
[edit] Introduction
The Seagram Building is an iconic skyscraper located on Park Avenue in mid-town Manhattan, New York City. It was designed by architect Ludwig Mies van der Rohe in the International Style, which would influence the architectural style of New York’s skyscrapers for several decades.
Characterised by sleek glass and metal, rather than the ornamental heavy stone and brick facades of previous decades, the Seagram Building signalled a new era of functional skyscraper, adopting a minimalist, corporate aesthetic.
The building stands 157 m (515 ft) tall, with 38 storeys and was completed in 1958. It was originally designed as the headquarters for Joseph E. Seagram’s & Sons, and was Mies’ first tall office building project.
Today, it is owned by RFR Holdings and remains a prominent example of mid-century modernist architecture. However, it also has an Energy Star rating of 3 out of 100, the worst of any New York building.
[edit] Architectural design
[edit] Structure
One of the key traits of the International style was to articulate the structure of the building externally, rather than concealing it under applied ornamentation.
The Seagram Building was built using a combination of a steel moment frame and a steel and reinforced concrete core for lateral stiffness, one of the first buildings of its kind to do so. The structural engineering consultants, Severud Associates, claimed it was the first tall building to use high-strength bolted connections, and the first to combine a braced with a moment frame. In addition, it was one of the first buildings of its kind to use a vertical truss bracing system.
Mies had intended for the steel frame to be visible, however, this was prevented by the American building codes which required the covering of all structural steel with concrete or another fire-resistant material. To give the building the vertical articulation he wanted, Mies used non-structural bronze-toned I-beams instead, which run vertically (in the same way as mullions), surrounding the large glass windows, also helping to stiffen the skin for wind loading. This method of a larger non-structural edifice being supported by an interior reinforced concrete shell would go on to be widely adopted for other buildings.
[edit] Window blinds
A characteristic of the International style is the building’s uniform appearance. To avoid the undesirable, disordered irregularity of window blinds being drawn to different lengths, Mies specified blinds which were operationally limited to three positions – fully open, halfway open, or fully closed.
[edit] Interior
It was the use of expensive, high-spec materials and lavish decoration in the interiors which made the Seagram Building the world’s most expensive skyscraper at the time of its completion. The building used 1,500 tons of bronze, in addition to travertine and marble. This was intended to provide cohesion with the sleek, yet minimalist, external aesthetic.
[edit] Plaza
Another pioneering feature of the design was Mies’ decision to set the building back 100 ft from the edge of the street, creating an open plaza. This was part of his response to the dense environment of Manhattan, and was a rebuke to the conventional economics of skyscraper design and urban planning.
The plaza incorporates two large fountains and outdoor seating, encouraging the socialisation of the space, and providing a 'threshold' linking the city with the building.
Such plazas have now become something of an architectural cliché, but at the time it was celebrated as being innovative and unique.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.