Risk assessments and method statements RAMS
Contents |
[edit] Introduction
RAMS are Risk Assessments and Method Statements.
[edit] Risk assessments
The Construction (Design and Management) Regulations (CDM Regulations) are intended to ensure that health and safety issues are properly considered during a project’s development so that the risk of harm to those who build, use and maintain structures is reduced.
They require that as the design progresses, risks are identified and eliminated and residual risks are reduced and managed and that designers, principal designers, principal contractors and contractors take account of the 'principles of prevention' in carrying out their duties, which in general terms are:
(a) Avoid risks where possible.
(b) Evaluate those risks that cannot be avoided.
(c) Put in place proportionate measures that control them at source.
Whilst the specific process of preparing a formal risk assessment is not a requirement of the CDM regulations, regulation 3(6)(a) of the Management of Health and Safety at Work Regulations does require that risks are controlled in the workplace, including construction sites. This involves thinking about what might cause harm to people and deciding what steps to take to prevent that harm. Where an employer employs five or more people, the significant findings of risk assessments must be recorded.
For more information, see Risk assessments.
[edit] Method statements
Method statements are widely used in construction as a means of controlling specific health and safety risks that have been identified (perhaps following the preparation of a risk assessment) such as; lifting operations, demolition or dismantling, working at height, installing equipment, and the use of plant.
A method statement helps manage the work and ensures that the necessary precautions have been communicated to those involved.
Like risk assessments, producing written method statements is not an explicit requirement of the CDM Regulations, however they are identified by the Health and Safety Executive as one way of satisfying the requirements of the regulations and as an effective means of assessing risks, managing risks, collecting workers’ views and briefing workers.
Method statements need be no longer than is necessary for them to be effective. They are for the benefit of those carrying out the work and so should be clear, should not be overcomplicated and should be illustrated where necessary.
For more information, see Method statements
[edit] RAMS
So, generally a risk assessment is undertaken to identify (and where possible eliminate) risks, and then a method statement is prepared to control residual risks.
They are sometimes described together as 'RAMS'. RAMS may be required by third parties to demonstrate that health and safety has been properly considered and that the requirements of the CDM regulations have been satisfied. For example, a contractor may require submission of RAMS form sub-contractors, a landlord may require submission of RAMS from tenants proposing to carry out works to a property, or a client may require submission of RAMS from contractors operating on their premises.
[edit] Related articles on Designing Buildings
- As Low As Reasonably Practicable (ALARP).
- CDM.
- Contractor.
- Deleterious materials.
- Demolition.
- Design risk management (DRM)
- Health and safety.
- How to write a method statement.
- Method statements.
- Permit to work.
- Principal contractor.
- Project execution plan.
- Risk assessment.
- Risk feedback.
- Site records and registers.
- Temporary works.
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.
Comments
Excellent, very helpful. I just bookmarked the website.