Dismantling buildings
Dismantling involves the careful deconstruction of building components for repair, re-use, re-purposing or recycling. Dismantling differs from deconstruction in that it can be undertaken as a means of conservation, maintenance and repair works, whereas deconstruction involves taking a building down, albeit in a careful way that aims to minimise waste and maximise re-use. Dismantling also differs from demolition in that it does not generally involve the clearance of an entire structure.
Dismantling can be required on projects where it is necessary to remove intricate components, where there is a safety risk (for example if a structure contains asbestos or other hazardous materials), where it is necessary to move a component from one place to another, or where the structure and/or surrounding environment is particularly sensitive.
The cost and time required for dismantling depends on factors such as; complexity, volume, site conditions, building type, time availability, materials and techniques used, available records and so on.
According to the Construction (Design and Management) Regulations (CDM Regulations), all dismantling work should be carefully planned and carried out by competent professionals to avoid unplanned structural collapse.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
AI and automation in 3D modelling and spatial design
Can almost half of design development tasks be automated?
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
The maintenance challenge of tenements.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese as well as English.