Preliminary business case for construction project
The preliminary business case sets out a justification for the investment that would be required by a potential development. It is used to decide whether the potential project merits being investigated in more detail.
A preliminary business case should be prepared very early in the project, before any decision has been made to proceed. It allows the client to explore high level options for meeting the requirements set out in the statement of need. This may include an assessment of comparable projects.
Experienced clients may have in-house expertise allowing them to prepare a preliminary business case. However, some clients will not have the full range of skills required and may wish to appoint independent client advisers to assist them.
A preliminary business case may include:
- Funding options.
- Legal agreements.
- Management structure.
- Objectives and mission statement.
- An assessment of constraints.
- Alternative solutions, such as refurbishment, or changing operational practices.
- A summary of options considered and discarded.
- Assessment of the main hurdles to surmount, show-stoppers, uncertainties and risks.
- Assessment of previous similar projects and lessons learned.
- Assumed procurement route.
- Assumed programme and phasing.
- A schedule of consultants that will be required.
- The market and competition.
- The budget, inclusions and exclusions and contingency allowance.
- A description of the business needs, benefits and keys to success and value.
- Public relations and external communications strategy.
- An assessment of any political consequences of the project.
- An assessment of the likely costs for the next stage.
- A proposal for the way forward.
- Relevant research, including assessment of similar facilities.
The preliminary business case is likely to be in a report format, however, where possible, information and requirements should be scheduled in a database or spreadsheet format that will be easy to expand and will be easy to use to test whether proposals satisfy requirements later in the project.
When, or if consultants are appointed, the preliminary business case should be updated to include their feedback and recommendations.
Once feasibility studies and options appraisals have been carried out by the consultant team, the preliminary business case should be developed into a full business case for the preferred option. The full business case is the document that will be used to obtain authority for the preferred option to progress to concept design.
[edit] Related articles on Designing Buildings Wiki
- Benchmarking.
- Budget.
- Business case.
- Cash flow.
- Client requirements.
- Constraints.
- Contingencies.
- Cost plans.
- Development appraisal.
- Feasibility studies.
- Funding options.
- Funding prospectus.
- Mission statement.
- Options appraisals.
- Risk.
- Risk management.
- Risk register.
- Whole-life costs.
[edit] External links
- OGC guidance on business cases.
- HM Treasury: Green Book, a framework for the appraisal and evaluation of projects.
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.