Legal agreement
In the UK construction industry, a "legal agreement" refers to a binding contract between two or more parties that outlines their rights, responsibilities, and obligations concerning a construction project. This contract is enforceable by law and forms the foundation of the relationship between the parties involved, such as the client, contractor, subcontractors, suppliers, and other stakeholders.
Whether an agreement is legally enforceable will depend on its type and form. A non-binding agreement, also known as a ‘gentleman’s agreement’ is typically oral (but can be written), or may be part of an unspoken agreement, and relies on an understanding between the parties that they will honour the agreement as opposed to it being enforceable. A binding agreement is also known as a contract and creates rights and obligations between the parties.
Legal agreements in the UK construction industry ensure that all parties are clear on their duties and responsibilities, help manage risks, and provide a framework for addressing any issues that arise during the course of the project.
Examples of legal agreements in the UK construction industry include:
- Construction contracts such as the JCT (Joint Contracts Tribunal) contracts, NEC (New Engineering Contract) contracts, and FIDIC (International Federation of Consulting Engineers) contracts.
- Subcontracts - agreements between the main contractor and subcontractors outlining the specific works to be carried out by the subcontractor.
- Supply agreements - contracts with suppliers for the provision of materials and equipment.
- Consultancy agreements - contracts with professional consultants, such as architects, engineers, and project managers.
- Framework agreements, often used by clients that are continuously commissioning construction work, to allow them to invite tenders from suppliers of goods and services to be carried out over a period of time on a call-off basis as and when required. For more information, see Framework contract.
- Partnering agreement is a broad term used to describe a collaborative management approach that encourages openness and trust between parties to a contract. The parties become dependent on one another for success and this requires a change in culture, attitude and procedures throughout the supply chain. Partnering can be arranged either by use of a traditional contract with a separate partnering agreement, or by use of a contract with an aligned partnering agreement. For more information, see Partnering.
- Pre-Construction Services Agreements (PCSAs) enable clients to employ contractors before the main construction contract commences. Typically, they are part of a two-stage tender process, used in the first stage to procure contractor involvement in the design process. For more information, see Pre-construction services agreement.
- Non-disclosure agreement.
- Planning performance agreement.
- Service level agreement.
- Concession agreement.
- Working rule agreement.
- Heritage partnership agreement.
- Hold harmless agreement.
- Listed building heritage partnership agreement.
- Project labor agreement (PLA).
- Reservation agreement for property purchase.
- Section 38 agreement - adoption of highways.
- Section 184 agreement - vehicle crossings over footways and verges
- Section 106 agreement - planning obligation.
- Section 278 agreement - works to existing highways.
[edit] Related articles on Designing Buildings
- Alternative dispute resolution.
- Boilerplate.
- Breach of contract.
- Clause.
- Collaborative practices.
- Construction contract.
- Duress and undue influence.
- Legal action.
- Legal agreements.
- Letter of intent.
- Maverick buying.
- Memorandum of understanding.
- Partnering and joint ventures.
- Standard form of contract.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.