Non-disclosure agreement for building design and construction
Non-disclosure agreements (NDA sometimes known as confidentiality agreements) are documents that can be agreed before confidential information is disclosed about a project, product or idea. They are legal contracts which set out how information can be shared, and formalise a relationship where it may not be wise to assume that the other party will keep information confidential.
They may protect information recorded in a certain form, perhaps marked as ‘confidential’, or they may protect information shared under certain circumstances, such as in presentations or meetings, or during the course of employment or consultancy. They can be used to prevent commercially sensitive information from being shared, or to prevent parties from communicating certain information to the press or other third parties.
For more information, see Proprietary information.
They may, for example, be signed:
- As a condition of entering into discussions about a potential relationship. For example, an inventor wanting to discuss their ideas with someone else.
- When developing a new product or process with someone else.
- To formalise a relationship, for example between an employer and employee or upon being appointed to a project to perform a specific task (such as a consultant, contractor, supplier and so on).
A non-disclosure agreement can limit the use of ideas and information for a specific purpose, although it is possible to amend them to allow for wider permission at a later date. Typically they will last for 3 to 5 years, following which the information can be used or disclosed publicly. However, they may last for the duration of a relationship (such as employment), or for a period after a relationship has ended, and some information can remain confidential indefinitely.
Non-disclosure agreements can cover information such as:
- Intellectual property.
- Commercial or trading information.
- Technical drawings or designs.
- Business plans.
- Customer and potential customer lists.
- Mathematical and chemical formulae.
- Trade secrets which could include a formulae, programmes or processes.
- Personal information about individuals involved in a project
- Non-patentable know-how.
Non-disclosure agreements should set out:
- The parties involved.
- The information protected.
- The duration of the protection.
- Permitted uses of the information.
- Circumstances under which the information may be shared (for example with employees).
- If the parties are located in different countries, the agreement will need to state which country’s law it is governed by.
- Whether it is one-way or mutual. A one-way agreement might be appropriate when only a single party is disclosing information whereas a mutual agreement would cover both parties.
It may not always be possible to secure a non-disclosure agreement, even where confidentiality is important to one of the parties, for example if the other party has nothing to gain by signing the agreement.
In some circumstances, parties can feel compelled to sign agreements which prevent reasonable use of information, for example if this is a condition of securing a large or prestigious contract. This was the case for the contracts relating to the London 2012 Olympics, where suppliers appointed to deliver the project where prevented from talking or writing about it, even after the games had finished. This was considered by many to be unnecessary, and driven by a desire to control press coverage and maximise sponsorship revenue, but it prevented UK companies from using their involvement in the games to enhance their profile and secure more work.
Public authorities, may be obliged to make certain information available to the public irrespective of any non-disclosure agreements, for example if they receive a Freedom of Information Act request.
Example agreements are available on the government website.
[edit] Related articles on Designing Buildings
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.