Freedom of Information Act 2000
Contents |
[edit] Introduction
The Freedom of Information Act 2000 (FOIA) is a UK Act of Parliament that creates a public ‘right of access’ to information held by public authorities. There are two ways in which this is provided:
- Public authorities are obliged to publish certain relevant information.
- Members of the public are entitled to request information from public authorities.
The act was a manifesto pledge made by Labour in 1997 and subsequently introduced as a White Paper by Dr. David Clark. The full provisions of the act came into force on 1 January 2005.
FOIA covers any recorded information held by a public authority in England, Wales and Northern Ireland, and by UK-wide public authorities based in Scotland (the Freedom of Information (Scotland) Act was introduced in 2002). Public authorities include government departments, the NHS, local authorities, state schools and police forces. Organisations that receive public money, such as charities, are not necessarily covered by the act, and in some circumstances private sector organisations that perform public functions may be covered, such as construction contractors.
[edit] The principles of the act
The main principle behind FOIA as stated by the original White Paper was to create a more open government based on mutual trust. It enshrines the right of people to know about the activities of public authorities unless there is a justifiable reason for them not to. The governing principles are as follows:
- Everybody has a right to access official information. Information should be kept private only when there is a good reason.
- An applicant is not required to provide a reason for requesting the information. Refusal to provide information must, however, be justified with a reason.
- All requests for information must be treated equally, as must all requesters of information.
- The information disclosed should be the same regardless of who has requested the information.
Information covered includes all recorded information held by a public authority. This is not limited to official documents, but also covers drafts, emails, notes, datasets, telephone recordings, CCTV recordings, letters received from members of the public, and so on.
A request is normally valid if it relates to information which already exists and does not have to be specially compiled for the purpose of meeting the request.
Under section 41 of the FOIA, a public authority does not have to disclose confidential information if both of the following two conditions are satisfied:
- It received the information from someone else.
- Complying with the request would be a breach of confidence that is actionable.
Section 43 also provides exemptions on matters of trade secrets, and when complying with the request would prejudice or be likely to prejudice someone’s commercial interest.
[edit] FOIA and construction
Parties to construction contracts are increasingly using FOIA to obtain information which might assist them in disputes over time or money. Despite the fact that a construction contractor is not a public body they can be regarded, as well as the subcontractors, as holding information on behalf of the public body. A public body may claim validly that they do not possess certain information and could issue a standard refusal notice to that effect, although this must comply with the FOIA requirements for non-disclosure.
The public body does have a duty to advise and assist in circumstances where it does not have the required information and so may pass the request on to the party that has the information, such as the contractor or subcontractor.
If a commercial third party is acting ‘on behalf of’ the public body then it can be regarded as a public authority itself. This means that the FOIA request can be made directly to them.
[edit] Related articles on Designing Buildings Wiki
- Local authority.
- Local planning authority.
- Public authority.
- Public project: PFI tender.
- Public project: tender.
- Statutory obligations.
[edit] External references
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.