Office of Government Commerce OGC
The Office of Government Commerce (OGC) was an office of HM Treasury. However, following the credit crunch in 2007, OGC was absorbed into the Efficiency and Reform Group (ERG) within the Cabinet Office in May 2010 (ref.Gov.uk, Whitehall shake-up in drive for efficiency, 15 June 2010).
When it existed, the OGC produced a great deal of guidance about best practice in procurement and project management. This OGC guidance has now been archived, however, it is still cited in the new Government Construction Strategy and the revised Common Minimum Standards (to become the 'Construction Standards') and links are still provided from government websites such as the Major Projects Authority. The OGC gateway review process still provides one of the best and most comprehensive sets of guidance for public projects. It is for this reason that the project plan for public projects within Designing Buildings Wiki follows the OGC gateway review process. See Public project: outline work plan.
The procurement routes preferred by the Government Construction Strategy and described by the OGC gateway review process are private finance initiative (PFI), prime contracting and design and build (see OGC Achieving Excellence Guide 6:Procurement and contract strategies). The Government Construction Strategy states that traditional procurement routes that separate design from construction should not be used unless it can be demonstrated that they offer better value for money.
The three preferred routes involve appointing a single integrated supply team (including designers, contractors, suppliers and perhaps facilities managers) after the project brief has been prepared, before design commences. This means that the main decision to invest (i.e. to appoint the integrated supply team), takes place before any designs have been prepared.
The OGC Gateway Review process offers a structure for projects following these procurement routes, based around a series of independent peer reviews carried out at key stages to verify that projects should be allowed to progress to the next stage.
These peer reviews, or 'gateway reviews' are commissioned on a confidential basis by the Senior Responsible Owner:
- OGC gateway review 0: strategic assessment.
- OGC gateway review 1: business justification
- OGC gateway review 2: delivery strategy (or procurement strategy)
- OGC gateway review 3: investment decision
- OGC gateway review 4: readiness for service
- OGC gateway review 5: operations review & benefits realisation (or benefits evaluation)
There are also two additional decision points specific to building projects:
A series of guides have been created by OGC, the Achieving Excellence suite which describes in detail the OGC gateway review procedure and OGC's preferred procurement routes:
- Achieving Excellence Guide 1 - Initiative into Action.
- Achieving Excellence Guide 2 - Project Organisation.
- Achieving Excellence Guide 3 - Project Procurement Lifecycle (this is the key document which explains the OGC procurement route, describing what should be done, when and by who.
Supporting guides:
- Achieving Excellence Guide 4 - Risk and Value Management.
- Achieving Excellence Guide 5 - The Integrated Project Team.
- Achieving Excellence Guide 6 - Procurement and Contract Strategies
- Achieving Excellence Guide 7 - Whole-Life costing.
- Achieving Excellence Guide 8 - Improving Performance.
- Achieving Excellence Guide 9 - Design Quality.
- Achieving Excellence Guide 10 - Health and Safety.
- Achieving Excellence Guide 11 - Sustainability.
Other Information:
NB OGC guidance is not currently being updated (for example it still refers to a 'planning supervisor' a role that has not existed for several years).
NB The damning 2011 House of Commons Treasury Select Committee report on PFI has found '...that PFI projects are significantly more expensive to fund over the life of a project and that there is no ...clear evidence of savings and benefits in other areas of PFI projects which are sufficient to offset this significantly higher cost of finance. It is difficult to see where this leaves private finance initiatives, however, there are more than 700 existing PFI projects, and as long as it continues to allow financing not to appear in government debt figures it is likely to remain a feature of procurement in the UK.
A Public procurement project plan is available from: Public project: outline work plan.
[edit] Related articles on Designing Buildings Wiki
- Achieving Excellence.
- Collaborative practices.
- Common minimum standards.
- Competitive procedure with negotiation.
- Crown Commercial Service CCS.
- Crown Representative.
- Design and build.
- Efficiency and Reform Group.
- Gateway.
- Governance for Railway Investment Projects (GRIP).
- Government construction strategy.
- Key dates.
- OGC gateway 0.
- OGC gateway 1.
- OGC gateway 2.
- OGC gateway 3.
- OGC gateway 4.
- OGC gateway 5.
- Major Projects Authority.
- Prime cost contract.
- Private finance initiative.
- Procurement policy note PPN.
- Project lifecycle for major road projects.
- Public private partnership.
[edit] External references
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.