[edit] What are NEC3 contracts?
NEC3 is a family of contracts that facilitates the implementation of sound project management principles and practices as well as defining legal relationships.
It is suitable for procuring a diverse range of works, services and supply, from major framework projects through to minor works and purchasing supplies and goods. The implementation of NEC3 contracts has resulted in major benefits for projects both nationally and internationally in terms of time, cost savings and improved quality.
This article explains how NEC contracts can be applied to highway management, and how they have been successfully employed for the Highway Maintenance Efficiency Program (HMEP)
[edit] How does NEC work?
NEC produces a diverse range of definitive end-to-end project management contracts that empower users to deliver projects:
The suite of contracts is uniquely flexible and can be used for the procurement of works, services and goods across all sectors – including public and private, buildings and infrastructure, plant and equipment – as well as all stages of the project lifecycle, from planning, design and project management to construction, maintenance and facilities management.
Each contract is supported by associated guidance notes and flow charts, explaining exactly what procedures should be followed by whom and when.
[edit] The NEC structure
The principal NEC3 contracts, short contracts and sub-contracts can be broadly grouped into works, services and supply. The choice of NEC3 form depends on the project complexity and level of risk.
Works encompasses purchases such as the construction, refurbishment and decommissioning of buildings, structures, process plants and infrastructure – including everything from houses, schools, hospitals and leisure facilities to infrastructure for water, energy, transport, industry and waste.
Services include purchases of professional services such as engineering, architectural, project management and consultancy works. It also covers composite services such as facilities management, cleaning, catering, security, maintenance and data processing.
Supply includes the supply of high-value goods and associated services such as transformers, generators, rolling stock, cranes, gantries and complex plant. It also includes lower-risk items such as building materials and products, stationery, personal protective equipment (PPE) and parts. Consultation documents should be clear about the consultation process, what is being proposed, the scope to influence and the expected cost and benefits of the proposals.
For further information, visit the NEC website. https://www.neccontract.com/
[edit] NEC contracts for highway management
NEC3 is widely recognised as having major benefits for projects both nationally and internationally in terms of time, cost savings and improved quality. For example:
[edit] Highways England Managed Motorway Framework
Highways England awarded a national framework contract for up to £2 billion of managed motorways schemes in February 2010. Balfour Beatty, a BAM Nuttall/Morgan Est joint venture, Carillion and a Costain/Serco joint venture were appointed to deliver the managed motorway schemes, which involve introducing variable speed limits and hard-shoulder running on sections of the busiest motorways to improve traffic flow during busy periods. Each scheme is being delivered as a package order using an NEC3 Engineering and Construction Contract.
[edit] Highways Maintenance Efficiency Programme (HMEP)
In a bid to ensure the critical success of the Government’s £6bn pledge to improve local roads between 2015 and 2021, the NEC suite of contracts has been positioned at the heart of a major overhaul of Local Authority (LA) highway service procurement.
Amongst growing pressure to tighten purse strings and requirements to make up any road network maintenance shortfall through other funding, a newly-established £578m fund – earmarked for rewarding LAs that can demonstrate efficiencies – represents a critical opportunity for councils.
The NEC3 Term Service Contract (with amendments) has been selected as the works contract at the centre of the new £6m Highways Maintenance Efficiency Programme (HMEP) – a sector-led procurement suite and best-practice framework established to revamp, simplify and standardise the way English Local Highway Authorities procure highway services.
The HMEP matches these essential savings and efficiencies with an ever-growing need for highways maintenance. It has been designed by the highways sector, for the highways sector, to enable change and provide the tools and resources to help leaders and managers transform delivery of roads and services.
Further details about the HMEP can be found here.
This article originally appeared as NEC contracts: application to road development and management schemes, published by the Institution of Civil Engineers on 31 March 2016. It was written by Adam Kirkup.
You can find more articles by the Institution of Civil Engineers here.
--The Institution of Civil Engineers
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Construction contract.
- ICE Conditions of Contract.
- Infrastructure conditions of contract.
- Institution of Civil Engineers.
- NEC3.
- NEC contract change management systems.
- NEC early contractor involvement.
- Overview of the road development process.
- Road construction.
- Road improvement scheme consultation.
- The NEC and the Z clause.
Featured articles and news
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.