Lift motor room
A lift (or elevator) is a form of vertical transportation between building floors, levels or decks, commonly found in multi-storey buildings.
A lift motor room (sometimes referred to as an elevator machine room), is a room that houses the machinery and electrical controls that operate a lift.
A lift motor room will typically contain:
- Electrical disconnects.
- Machine (geared, gearless or drum type).
- Machine brake.
- Drive motor.
- Encoder.
- Motor generator set.
- Selector.
- Counterweight governor.
- Rope gripper.
- Light fixtures and light control switch.
- Fire alarm devices.
- Hoist beam.
- HVAC equipment.
- Deflector sheaves.
Typically, the entrance to a lift motor room is located in a public corridor, but the room should be fully enclosed or otherwise secured against non-authorised access.
A lift motor room should be well-ventilated and provided with a controlled environment to prevent damage to the equipment. A lifting beam on the ceiling and a floor hatch should be included so that heavy machinery and parts can be winched in and out of the room.
For traction lifts, the room is usually located above the hoistway of the lift that is served by the equipment. This is often on a rooftop of a building or two storeys above the highest storey that the lift serves.
The room can also be found on the ground floor or in the basement if overhead space is unavailable. In this case, the lift cable is a complete chain with an unpowered sheave at the top of the shaft and a powered sheave at the bottom. It may also be on the ground floor or in the basement in the case of hydraulic lifts.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Heat pumps, vehicle chargers and heating appliances must be sold with smart functionality.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
New-style degrees set for reformed ARB accreditation
Following the ARB Tomorrow's Architects competency outcomes for Architects.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.