What is a housing start?
A housing start, also known as a new start, is an economic indicator used to determine the number of new residential construction projects that have begun over a certain period (such as a month, a quarter or a year).
The start of the construction is considered to be the date on which excavation begins for the footings or foundation of the building, or when work begins building on an existing foundation. All the housing units within a building are counted as having started when this excavation begins; for example, when work begins on semi-detached houses, or when work begins on the foundations of an apartment building.
The figures for new housing starts can provide an indicator for how the economy is performing over a given period of time. The types of new houses that are being started can also provide insights into the particular direction in which the economy is moving, e.g. a decline in new starts of suburban single-family houses and an increase in new starts of inner-city apartment buildings may indicate a move to more affordable housing options in closer proximity to urban centres.
Speculative builders and property developers use data on new housing starts to inform their procurement of land for development and their plans for their existing portfolio of land.
Politicians and economists use new starts data to assess the effectiveness of policies to tackle the housing crisis.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.