Hope value of developments
Hope value is the term used to describe the market value of land based on the expectation of getting planning permission for development on it. This differs from the existing use value which is what the land or property is worth in its current form.
Generally, land that has planning permission for development has a higher value than land that does not. For example, a farmer may receive a valuation of their land that reflects its agricultural value. However, if the farmer were to secure planning permission to build a housing development on the land, the value could rise considerably.
Hope value is the value based on the expectation that land will get permission for development in the future, meaning that it is likely to be worth more. The hope value will rise as the prospect of planning permission becomes more likely, for example, if it is identified for development in the Local Plan, or if similar land is granted permission.
Hope value is defined by RICS as “...any element of open Market Value of a property in excess of the current use value, reflecting the prospect of some more valuable future use or development”.
In December 2024 the Labour government opened a consultation on proposed changes to compulsory purchase order (CPO) rules, including the removal of “hope value” to support affordable housing delivery. Hope value, reflecting the potential future development value of land, often increases compensation costs for landowners. The consultation closes in February 2025, for further information and to make a response visit the government website page Open consultation: Compulsory Purchase Process and Compensation Reforms.
[edit] Related articles on Designing Buildings
- Avoiding planning permission pitfalls.
- Development appraisal.
- Difference between existing use value and market value.
- Existing use value.
- How long does it take to get planning permission.
- Land acquisition.
- Land value.
- Meanwhile use.
- Off-plan property.
- Permitted development.
- Planning permission.
- Rating valuation.
- Residual valuation.
- Speculative construction.
- Use class designation for land and buildings.
- What is a housing start?
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.