Home Survey Standard level 2 survey
The RICS Professional Standard 'Home survey standard UK' (HSS- 1st edition, November 2019. Effective from 1 March 2021) defines the HSS A1 Survey level two as a service which is:
"...for clients who are seeking a professional opinion at an economic price. It is, therefore, less comprehensive than a level three service. The focus is on assessing the general condition of the main elements of a property. This intermediate level of service includes a more extensive visual inspection of the building, its services and grounds, but still without tests. Concealed areas normally opened or used by the occupiers are inspected if it is safe to do so (typical examples include roof spaces, basements and cellars). The report objectively describes the condition of the different elements and provides an assessment of the relative importance of the defects/problems. At this level, although it is concise, the report does include advice about repairs and any ongoing maintenance issues. Where the surveyor is unable to reach a conclusion with reasonable confidence, a recommendation for further investigations should be made. This level of service suits a broader range of conventionally built properties, although the age and type will depend on the knowledge and experience of the RICS member. This level of service is unlikely to suit:
- complex buildings, for example those that have been extensively extended and altered
- unique or older historic properties – although survey level two services may be appropriate for some older buildings, the decision will depend on the RICS member’s proven competence and knowledge and the nature of the building itself. For example, a survey level two report on homes with traditional timber frames or those built much before 1850 is likely to be inconclusive and be of little use to the client or
- properties in neglected condition.
In such cases, a survey level two service will often result in numerous referrals for further investigations, an outcome that many clients find disappointing. Where the client is planning to carry out extensive repair and refurbishment work in the future, the RICS member should give advice on suitable additional services."
See also Building survey, HSS level 1 survey, HSS level 3 survey and Home Survey Standard HSS
[edit] Related articles on Designing Buildings
- Building pathology.
- Condition Report.
- Ecological survey.
- Ground investigation.
- Historic building investigation.
- Home information pack HIP.
- Homebuyer Report.
- Land surveying.
- Levelling.
- Measurement of existing buildings.
- Site appraisals.
- Site surveys.
- Soil report.
- Soil survey.
- Surveying instruments.
- Surveyor.
- Thermography for traditional buildings.
- Vendor survey.
- Walkover survey.
Featured articles and news
Shortlist for the 2025 Roofscape Design Awards
Talent and innovation showcase announcement from the trussed rafter industry.
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.