Heat networks
The Energy White Paper, Powering our Net Zero Future (CP 337), published in December 2020 by HM Government, states: ‘A heat network, sometimes called district heating, is a system of insulated pipes that takes heat or cooling generated from a central source and distributes it to a number of domestic and non-domestic buildings.’
On 29 June 2016, the Department of Energy & Climate Change (DECC) announced a consultation on how to deploy the £320 million allocated in the Spending Review to the Heat Networks Investment Project (HNIP) for investment into heat networks over the next five years.
Heating is the largest single user of energy and emitter of greenhouse gases in the UK. It accounts for around 45% of energy use: predominantly for space heating in homes and offices, heating water, cooking and industrial processes. Heat production accounts for around 30% of UK carbon emissions.
Heat networks have the potential to reduce heating costs by more than 30% for some households to reduce carbon emissions.
Heat can be taken from a range of sources including large heat pumps, combined heat and power plants and deep geothermal plants, as well as heat currently pumped into the air by waste incinerator plants, factories and offices, which can be captured by a network of pipes and pumped to homes and businesses nearby to provide warmth.
Dubbed ‘central heating for cities’, heat networks already exist in the UK in city centres such as Sheffield, Nottingham, Birmingham, Southampton and in a number of housing developments, such as the Olympic Village. However, there are far fewer networks than other European countries. There are extensive networks in France, Germany, and Scandinavian countries which deliver 'cheap' and lower-carbon heat to thousands of buildings from multiple and varied sources of heat. 90% of homes in Copenhagen are on a network.
The government aims to launch the first funding round through the Heat Networks Investment Project in 2012, followed by a series of funding rounds through to early 2021.
The Rt Hon Amber Rudd MP, Secretary of State for Energy and Climate Change said: “This is an important next step in developing more home-grown energy, which is a vital part of our plan to ensure long-term energy security and affordable energy for our families and businesses. The funding we’re consulting on today will enable these schemes to provide affordable low carbon energy to thousands of homes and businesses across Britain’s towns and cities.”
The government is consulting with current and potential heat network sponsors, investors, suppliers, and any other stakeholders, seeking views about how best to use the capital support funding to overcome barriers to investment in heat networks and increase heat network deployment rates.
They are inviting views on a range of scheme design issues, including the organisations and types of schemes that should be eligible for investment support, what form this funding should take, and the criteria that should be used to assess applications for funding.
The consultation closed on 3 August 2016.
On 17 October 2016, the Department for Business, Energy & Industrial Strategy announced that the £320m scheme would run over five years and further instalments of funding would be released in due course. The initial part of the funding, worth up to £39m, will be open to local authorities and public sector bodies. In future years this will be opened up to a wider set of applicants. Ref gov.uk New 'central heating for cities' to help reduce energy bills.
In December 2021, the government announced a £19 million investment towards setting up 5 new heat networks, 2 in Bristol, and 3 in Liverpool, London and Worthing, providing households and workplaces with more a low-carbon alternative to installing individual gas boilers. Ref https://www.gov.uk/government/news/uk-government-announces-major-expansion-of-heat-networks-in-latest-step-to-power-homes-with-green-energy
[edit] Related articles on Designing Buildings
- A technical guide to district heating (FB 72).
- BSRIA guide to heat interface units.
- Combined heat and power.
- Community energy network.
- Community heating.
- District energy networks.
- Geothermal energy.
- Heat interface units.
- Heat meter.
- Heat Networks (Scotland) Bill.
- Heat sharing network.
- National heat map.
- Renewable energy.
- Site-wide heat network.
- Smoothing the path to net zero.
- Water source heat map.
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.