[edit] Introduction
There are a number of ground improvement or ground modification techniques that can be used to stabilise or improve the condition of an area of ground before construction work takes place. This may be necessary to improve or modify the ground shear strength, stiffness, permeability, and so on.
Some of the most techniques include:
[edit] Grouting
Grouting in civil engineering refers to the injection of pumpable materials into a soil or rock formation to change its physical characteristics. It is one of the ways in which ground water can be controlled during civil engineering works. Grouting is suitable where soil permeability would create a heavy demand on pumping or where ground conditions mean it may be economically inefficient to bore wells.
Jet grouting uses high velocity fluid jets to construct cemented soil and is commonly used to underpin foundations and provide excavation support.
Chemical grouting uses a low viscosity, non-particulate grout to permeate pore spaces in granular soils and hardens to create a cemented mass.
For more information, see Grouting in civil engineering.
[edit] Soil mixing
Soil mixing improves soft clays, peats and other weak soils with a high moisture content. It involves mechanically mixing the wet soils with a dry cementitious binder to create soilcrete. This helps increase bearing capacity and decrease settlement.
[edit] Soil compaction
Soil compaction produces an increase in soil density and a decrease in air volume without producing a decrease in water content. It can improve shear strength, stiffness, bearing capacity and stability, reducing settlement and frost heave. This may be necessary in the construction of bases for highways, embankments and so on, or to create a suitable level base for the construction of a building. Existing soil can be compacted, or layers of new soil can be compacted, taking a site to the required level.
For more information see: Soil compaction.
[edit] Vibro-replacement
Vibro-replacement works by using a crane-suspended downhole vibrator to construct stone columns through weak soils, improving their load-bearing and settlement capacities. Another term that can be used for this technique is vibro stone columns (VSC).
For more information, see Vibro-replacement.
[edit] Geotextiles
Geotextiles are typically made using synthetic fibres such as polyester or polypropylene which create a flexible and porous fabric capable of providing strength and stability. Geotextiles have the ability to reinforce, protect, filter, drain and separate, and many applications use them alongside soil, placed at the tension surface for strength purposes.
For more information, see Geotextiles.
[edit] Cement/lime stabilisation
This involves the addition of a binder product such as hydrated lime or quicklime to soil which reduces moisture and improves stability.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.