[edit] What is FMEA and when is it used?
FMEA is a step by step approach for collecting knowledge about possible points of failure in a design, manufacturing or construction process, product or service:
- When a process, product or service is being designed or redesigned
- When an existing process, product or service is being applied in a new way
- Before developing control plans for a new or modified process
- When improvement goals are planned for an existing process, product or service
- When analysing failures of an existing process, product or service
- Periodically throughout the life of the process, product or service.
[American Society for Quality (ASQ) 2017]
[edit] History of FMEA
FMEA was first used by the US navy in 1949 to understand and control the risks in their procedures, including operation of weapon systems. It was also used in the 1960’s for the Apollo missions and then from the 1970’s by the automotive industry.
[edit] Use of FMEA in the project Lifecycle
It can be used by project teams to assess and control how a process or item can fail for example:
- Design – to check the feasibility of design prior to build
- Material – to ensure correct selection of material prior to build
- Construction – to understand risks in assembly prior to build
- Commissioning – to understand potential operational failures prior to use
- Changes to Plan – the potential risks resulting from having to change a process or an item
[edit] Benefits
- Captures collective knowledge of team
- Improves quality, reliability and safety of the process
- Logical structured process identifying areas of concern
- Reduces development time and cost
- Quality led activity
[edit] Steps to undertake the FMEA
[edit] Setup
Preparation for Workshop |
Assembling the Team
|
Creating FMEA Template
|
[edit] Consider potential failures (for each critical item / process list the potential points of failure)
Failure Mode |
Effect of failure
| ||||||
Cause of failure
|
Current controls |
[edit] Assessment of failure
Occurrence (OCC)
|
Severity (SEV) |
Detection (DET) |
Risk Priority Number (RPN)
|
[edit] Actions to be taken
|
Revised Assessment
|
Post FMEA
|
[edit] Related Tools
- DFMEA – procedure used in engineering to explore the possibility of a design failing in a real world situation.
- PFMEA – procedure which focuses on the failures of a process
- FMECA – extension to FMEA which introduces an additional metric called criticality.
This article was originally written by Alan Grogan on behalf of the CQI Construction Special Interest Group, reviewed by members of the Competency Working Group and approved for publication by the Steering Committee on 1 May 2019.
--ConSIG CWG 20:27, 26 May 2019 (BST)
[edit] Related articles on Designing Buildings
- Annex SL.
- Change control: a quality perspective.
- Cracking and building movement.
- Defects.
- Design Failure Mode and Effects Analysis.
- Failure.
- How to write an inspection and test plan.
- Inspection and test plan.
- Latent defects.
- Lifts and escalators: a quality perspective.
- Mobilisation to site: a quality perspective.
- Patent defects.
- Quality tools: fishbone diagram.
- Smarter systems predicting failure.
- Structural steelwork: a quality perspective.
- Why should quality be important to the construction industry?
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.