Failure modes and effect analysis (FMEA)
Contents |
[edit] What is FMEA and when is it used?
FMEA is a step by step approach for collecting knowledge about possible points of failure in a design, manufacturing or construction process, product or service:
- When a process, product or service is being designed or redesigned
- When an existing process, product or service is being applied in a new way
- Before developing control plans for a new or modified process
- When improvement goals are planned for an existing process, product or service
- When analysing failures of an existing process, product or service
- Periodically throughout the life of the process, product or service.
[American Society for Quality (ASQ) 2017]
[edit] History of FMEA
FMEA was first used by the US navy in 1949 to understand and control the risks in their procedures, including operation of weapon systems. It was also used in the 1960’s for the Apollo missions and then from the 1970’s by the automotive industry.
[edit] Use of FMEA in the project Lifecycle
It can be used by project teams to assess and control how a process or item can fail for example:
- Design – to check the feasibility of design prior to build
- Material – to ensure correct selection of material prior to build
- Construction – to understand risks in assembly prior to build
- Commissioning – to understand potential operational failures prior to use
- Changes to Plan – the potential risks resulting from having to change a process or an item
[edit] Benefits
- Captures collective knowledge of team
- Improves quality, reliability and safety of the process
- Logical structured process identifying areas of concern
- Reduces development time and cost
- Quality led activity
[edit] Steps to undertake the FMEA
[edit] Setup
Preparation for Workshop |
Assembling the Team
|
Creating FMEA Template
|
[edit] Consider potential failures (for each critical item / process list the potential points of failure)
Failure Mode |
Effect of failure
| ||||||
Cause of failure
|
Current controls |
[edit] Assessment of failure
Occurrence (OCC)
|
Severity (SEV) |
Detection (DET) |
Risk Priority Number (RPN)
|
[edit] Actions to be taken
|
Revised Assessment
|
Post FMEA
|
[edit] Related Tools
- DFMEA – procedure used in engineering to explore the possibility of a design failing in a real world situation.
- PFMEA – procedure which focuses on the failures of a process
- FMECA – extension to FMEA which introduces an additional metric called criticality.
This article was originally written by Alan Grogan on behalf of the CQI Construction Special Interest Group, reviewed by members of the Competency Working Group and approved for publication by the Steering Committee on 1 May 2019.
--ConSIG CWG 20:27, 26 May 2019 (BST)
[edit] Related articles on Designing Buildings
- Annex SL.
- Change control: a quality perspective.
- Cracking and building movement.
- Defects.
- Design Failure Mode and Effects Analysis.
- Failure.
- How to write an inspection and test plan.
- Inspection and test plan.
- Latent defects.
- Lifts and escalators: a quality perspective.
- Mobilisation to site: a quality perspective.
- Patent defects.
- Quality tools: fishbone diagram.
- Smarter systems predicting failure.
- Structural steelwork: a quality perspective.
- Why should quality be important to the construction industry?
Featured articles and news
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.