Process control
Introduction to Construction Quality Planning, Applying APQP to construction manufacturing, published by the Construction Innovation Hub in December 2019, states process control (PC): ‘…enables monitoring of the process in such a way that any variation showing instability in the process can be quickly identified and acted upon. In the manufacturing sector, this is referred to as ‘special cause variation’. By getting rid of such ‘special cause variation’ the process becomes stable and quality becomes predictable. More advanced process controls can be established as the manufacturing process becomes more mature. Process capability indices are sometimes used to monitor the KCs or CIs identified by the DFMEA (Design Failure Mode and Effects Analysis). These indices provide for monitoring the short-term and long-term capability of a given process. Therefore, clients and tier 1 contractors can be assured that the supply chain have achieved minimum acceptable maturity through the adoption of this toolset.’
[edit] Related articles on Designing Buildings
- Advanced product quality planning.
- Construction Innovation Hub.
- Construction product approval process.
- Construction quality planning.
- Not right first time.
- Plan, Do, Check, Act (PDCA).
- Product design requirements.
- Product validation.
- Production readiness review.
- Project quality plan.
- Quality control.
- Quality cost and delivery.
- Quality in construction projects.
- Quality load and capacity report.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.